Dissolved Air Flotation unit used in municipal wastewater treatment
USD $3,600 - $20,000 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
Dissolved Air Flotation unit used in municipal wastewater treatment
The Dissolved Air Flotation-DAF Series systems are designed for removal of many types of contaminants via flotation. The DAF systems are designed with many features and options to provide engineers, system integrators and end users with convenience and flexibility in system integration choices. Customization & modifications are available.
By the compressor,the air will be sent into air tank.Then it will be taken in air dissolved tank by jet flow device.In the dissolved tank,the air will be liquefied under 0.35Mpa pressure.Then the liquefied are will be sent to air flotation tank.When released suddenly, the air will be dissolved out and turn into a microbubble group.The group will meet the flocculating suspension in the sewage which is sent by pump and already medicated.It will be absorded in the flocculated suspension while slowly rising up.Along with reduction of the suspension's density,the suspension will go up to the water surface.Finally,the SS and CODcr will be removed.
Qingdao Yimei Environment Project Ltd. is found in 1988.We are located in the largest port city-Qingdao China. Our factary take up 36,000 square metres and there are more than 130 kinds machine for manufacturing. As a member of Shandong Province Environmental Protection Industrial Association, we have 360 staff and 72 experienced engineers.
Our main product is the equipment for Environment Protection and Waste Water Treatment.And the product is popular all over the world,such as Africa, North America,Domestic Market,Eastern Asia,Mid East.
[Q]How to buy your idea products?
[A]You can provide us your water sources, water quality, flow rate and ground area (contact us for more details).
[Q]What is your payment terms?
[A]TT and L/C are acceptable and TT will be more appreciated.30% deposit in advance and balance before loading.
[Q]What is the delivery time?
[A] It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
[Q]How to pack the products?
[A]We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
[Q]How to keep your equipments from corrosion?
[A]We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
[Q]How do you manufacture your equipment ?
[A]Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
[Q] How to install after the equipments arriving destination?
[A] We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.
If you are interested in our product and company,please do not hesitate to contact us.