Gantry 1325 / 1330 CNC Plasma Cutting Machine
Negotiable /Set
Min.Order:1 Set
Nanjing Chaohan Digital Machinery Co., Ltd.
Gantry CNC Plasma Cutting Machine (with pinion rac) for aluminum, iron plate
widely used multi purpose iron metal plate square rail metal cutting plasma machine
CNC router waterjet stainless steel carbon steel sheet processing machine manufacturer
CNC router waterjet stainless steel sheet processing machine manufacturer
Parameter:
Model | Optima1325 | Optima1330 |
Processing materials | Iron, Aluminum, Stainless Steel, Copper, Titanium, Nickel, etc. | |
Machine size | 1850mm*3000mm*1300mm | 1850mm*3600mm*1300mm |
Processing area | 1300mm*2500mm | 1300mm*3000mm2 |
Processing thickness | (60A) 0.5-5mm (0.5-10mm with 100A is available) | |
Cutting speed | 0-8m/min | |
Air-way speed | 0-50m/min | |
Power | 8.5KW or 9kw | |
Input voltage | 3-phase 380V | |
Power frequency | 50HZ | |
Arc means | Non-contact Arc | |
Files Transfer | USB Interface and U disk Interfaces | |
Operation software | NC Studio (english version, original) | |
Operation method | DSP wired remote control | |
Graphics Software | Type 3 (english version, original) | |
Supported files forms | PLT, NC, etc. | |
Cooling method | Water cooling system | |
Packing | Wooden case with tray | |
Warranty | Cutting Torch for 6 months, all other parts for 12 months. |
Functions and Applications:
Structure | Gantry structure and dual-bean structure, with light weight, low inertia, but high precision; |
Feature | Automatic ignition and height adjustment system, flexible cutter head |
Merits | Small cutting incision, clear, no dregs, avoiding the secondary finishing process. |
Applications | Iron and aluminum plates, zinc plate, white iron plates, titanium plates and other metal plates. |
Service:
Warranty | Laser tube: 6 month; other parts: 1 year |
Technical Support | All Life |
Trading Terms:
Payment Terms | T/T or L/C |
Delivery Terms | FOB Shanghai, China or other terms |
Payment Condition | 1. By T/T, 20% as deposit and the balance should be paid off before shipment; or 2. L/C covering 100% amount of the contract reaching us 21 days before shipment. |
Packing | Inside cling film, and a wooden case with wooden tray. |
Factory
Samples
Certificates
Our team
Packing