waste tyre recycling plant complete
USD $503210.00 - $503210.00 /Set
Min.Order:1 Set
Henan Huatai Cereals And Oils Machinery Co., Ltd.
Specifications for waste tyre recycling plant complete
A. Biodiesel workshop index
1. Raw material requirements:
Moisture and volatile matter content% ≤ 0.5
Insoluble impurities ≤ 0.5%
Acidity / (mg KOH/g) ≥180 or ≤3
2. Consumption for producting one ton biodiesel:
Plant oil 1025kg
Methanol 100kg
Sulfuric acid 10kg
NaOH 20kg
Water 1500kg
Electricity 200kw*h
Steam 1000kg
3. Percent conversion: 85-90%
B. Biodiesel performance index
1.Performance comparison of biodiesel and petrodiesel
Features | Biodiesel | Petrodiesel |
200C density(g/ml) | 0.88 | 0.83 |
400CB dynamic viscosity(mm2/s) | 4-6 | 2-4 |
Flash point(P,M airtight glass 0C) | >100 | 60 |
flammability(cetane number) | minimum 48 | minimum 46 |
heat value (MJ/l) | 32 | 35 |
Combustion efficacy(%) | 104 | 100 |
sulphur content(W %) | <0.001 | <0.2 |
oxygen content(V %) | 10 | 0 |
minimum air consumption of burning 1kg fuels according to the chemical method(KG) | 12.5 | 14.5 |
Water hazard rating | 1 | 2 |
biological decomposition rate after three weeks(%) | 98 | 70 |
C.Biodiesel production process flow
Welcome to
-- Henan Huatai Cereals & Oils Machinery Co., Ltd.
-- Covers100,000.00 square meters and have more than 580 staffs
-- Located in the Industry cluster of Huaxian, Henan Province
-- Specialized in researching, designing, manufacturing, installation
-- 22 items national patents, 6 international prizes, etc.
-- Our equipments have got ISO9001, SGS, CE, IAF and CNAS certifications.
-- Oversea customers include Bolivia, Sudan, Kazakhstan, Russia, Tajikistan,
Malaysia, Indonesia, Bangladesh, Egypt, Vietnam, Thailand, Burma, etc.
Factory Base
CUSTOMERS VISITING:
CERTIFICATES
1. Ensure to timely provide complete sets of equipment and accessories.
2. Ensure that one-time installation debugging acceptance.
3. To provide high quality material with preferential price.
4. Priority to provide customer our new craft works and products.
5.In the installation process, we will appoint a installation supervision staff on the spot.
6. On-line debugging and Feeding trial operation.
CONTACT ME: