42CrMo4 cold drawn unhoned seamless tubing
USD $1,500 - $2,000 /Ton
Min.Order:1 Ton
Changzhou Chengxin Metal Products Co., Ltd.
42CrMo4 cold drawn unhoned seamless tubing is a kind of precision seamless tubes with negative ID tolerance suitable for further honing or skiving&roller burnishing used to produce hydraulic cylinder barrel.
Commodity: 42CrMo4 cold drawn unhoned seamless tubing
Standard&material: EN10305-1 42CrMo4 and other steel grades like E355,25CrMo4,34CrMo4,DIN2391-2 ST52,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1541,SAE4130,SAE4140,etc.
Size range: 40mm*30mm-325mm*300mm
Manufacture method: cold rolled, hydraulic cold drawn
Delivery condition:
+C | +LC | +SR | +A | +N |
BK | BKW | BKS | GBK | NBK |
cold drawn/hard | cold drawn/soft | stress relieved | annealed | normalized |
ID tolerance: appointed by buyer.We suggest -0.5mm/-0.8mm for honing, and -0.7mm/-1.0mm for skiving&roller burnishing.
OD tolerance: as per EN10305-1
W.T tolerance (eccentricity): +/-5%
Straightness: 0.5mm/1000mm max, 0.8mm/1000mm max, 1.2mm/1000mm max depending on different size and length.
Chemical composition - 42CrMo4:
Element | C | Si | Mn | P | S | Cr | Mo |
Content (%) | 0.38-0.45 | 0.40 max | 0.60-0.90 | 0.035 max | 0.035 max | 0.90-1.20 | 0.15-0.30 |
Packing method: in bundles tied with steel strips.
Slightly internal and external oil coating for anti-rust protection.
End plastic caps covering both ends of tube.
Marking on each tube: to be confirmed.
Mechanical stamp on each tube: to be confirmed.
Shipping: by containers.
Based on the machines and manufacturing facilities we have, the following services can be provided:
1. Internal honing
2. External surface polishing
3. OD grinding
4. deep hole drilling
5. End machining
6. Internal threading
7. End welding
We are ISO9001-2008 certified manufacturer of hydraulic cylinder tubes and cylinder barrels with annual capacity of 12000 tons.
Payment method we accept:
30% deposit,balance before shipment.
30% deposit,balance against copy of B/L.
30% deposit,balance against L/C at sight.
Delivery time: 30 days for CDS tubes,50 days for skived and roller burnished tubes, 60 days for honed tubes.
MOQ: 4 tons for each size.
Trade term we accept: FOB,CFR,CIF,DAP.
Third party inspection or customer's inspection is acceptable.