Boiler steel tube pipe
USD $700 - $2,000 /Ton
Min.Order:5 Tons
Changzhou Chengxin Metal Products Co., Ltd.
Commodity: Boiler steel tube pipe
Manufacture method: cold rolled, cold drawn, hot rolled,hot expanded.
Standard specification and material: ASTM A53 Gr,A,Gr.B, ASTM A106 Gr.A,Gr.B,Gr.B,ASTM A179, ASTMA 192,ASTM A209 T1, ASTM A210 Gr.A1,Gr.C, ASTM A213 T2,T5,T9,T11,T12,T22,T23, ASTM A335 P1,P2,P5,P9,P11,P22,P23, DIN17175 ST35.8,ST35.8-III, ST45.8,ST45.8-III,15Mo3,10CrMo910,13CrMo44,12CrMo195,BS3059-1 CFS360,EN10216-1 P195TR1,P195TR2,P235TR1, P235TR2,P265TR1,P265TR2,EN10216-2 P195GH,P235GH,P265GH,16Mo3,10CrMo5-5,13CrMo4-5,10CrMo9-10,25CrMo4,etc.
Size range: 12.7mm*1.2mm - 325mm*35mm
Delivery condition: normalized, normalized+tempered.
Packing: bundle packing, black paiting or varnish or oil coating, end plastic caps.
Marking: as per customer's requirement.
We supply tubes based on FOB,CFR,CIF,as well as DAP term.
Payment method: 30% deposit,balance before shipment or against copy of B/L or L/C at sight.
MOQ: 5 tons for each size.
Warranty: 1 year after shipment of tubes.
Third party inspection or customer's inspection is acceptable.