IMO Approval Marine Sewage Treatment Device With Price
USD $1 - $2 /Set
Min.Order:1 Set
Chongqing Gathering Marine Equipment Co., Ltd.
Compact Easy Operation Marine Sewage Treatment Plant for Sale
Marine Waste incinerator/Medical Waste Incinerator/Garbage incinerator
INC-18,INC-50,INC-80 Marine Waste Incinerator/Garbage Treatment
EC approved GRCM Series Compact Marine Sewage Treatment Plant
SOLAS Approved Marine Waste Incinerator/ Solid Waste Management
IMO Approval Marine Sewage Treatment Device With Price
Features
ABS, CCS,BV,EC Approval
IMO Approval
Meet resolution of MEPC.159.(55) enacted on October2006.
Used for seaport,dock,industry,petroleum ,various vessels
The device adopts the principle of Activated Sludge,Bio-contact Oxidation and Membrane Biological Reactor(MBR) to digest organic pollutant.MBR can treat organic pollutant efficiently,drastically and cleanly to ensure the effluent can meet the requirements of the resolution MEPC.159(55) and other much harsherrequirements.
GRCM-15 (15 persons)
GRCM-20 (20 persons)
GRCM-25 (25 persons)
GRCM-30 (30 persons)
GRCM-40 (40 persons)
GRCM-400 (400 persons)
Specification
1.Adopting horizontal circular design,ellipse closures on both ends,pressure resistance and compact structure.
2.The device is adopted auto-control,and compliance with the requirment of 24h unattened cabin.
3.Adopting the "MBR" technology,devices allow to the narrow size,and solve the conflict of small space of carbin,but big volume of device.
4.The intermittent aeration in bio-membrane tank and hollow fiber membrane tank,form the process of "aerobic-anoxic",and resolve the problem of "nitrogen and phosphorus removal.
5.The device is adopting the principle of "air-lifting" to transfer the sludge from sediment tank and membrane tank to aeration tank,meantimes the "pump stops and air never stopped",so as the scale on the membrane surface comes dowm.Due to back flushing and clean the membrane "online" usd technol;oge patent.
6."Online" cleaning technology,making the dirt on membrane off automatically,recover membrane flux.It can be solved the problem of openning the cleaning or replacement of the membrane difficultly caused by the small space in cabin.
7.The effluent after further treatment can be reached at the requirment of "water recovery".
Pictures