track roller for excavator/earthmover
USD $27 - $105 /Piece
Min.Order:10 Pieces
Quanzhou Red Hill Engineering And Machinery Co., Ltd.
1.Product Introduction
State-of-the art machining
Each roller shaft is engineered drop-forged and machined by the utilization of the most modern technological advances known to the industry,Grinding and finishing methods ensure mirror kike finish and tempering with medium to low frequency heat treating equipment guarantees maximum strength.
Maximum life
Each roller shell is carefully heat treated to ensure long wear life and stress resistance.
Precision care
Each roller is precision machined to house special high impact low wear bimetal bushings.
1.png2.png3.png
2.Workshop
workshop 3.jpgworkshop .jpgworkshop 2.jpg
3.Package
The product will be packed with fumigated wooden pallet
komatsu undercarriage parts.jpgkomatsu undercarriage parts 2.jpg
4.Certificate
.jpg
5.Hot Product
Now about PC200,PC100,EX200,EX100,EC210,EC240,SH200,SK200,R210 are very popular in our market.
excavator top rollers.jpg
spare part carrier roller
.jpg
spare part
track roller
front idler20130810-2.jpg
spare part
front ilder
bulldozer track link assy.jpg
spare part
track link
If want to know more about our company for Bulldozer/ Excavator Spare Part, please click our website: http://redhillmachinery.en.china.cn
or /main_en.asp
Come on! Red Hill Machinery is willing to enter into a win-win business relationship with your esteemed company!