HDPE floats for slurry dredging project

HDPE floats for slurry dredging project

USD $100 - $1,000 /Pair

Min.Order:10 Pairs

Supply Ability:
5000 Unit / Units per Month
Port:
qingdao port OR tianjin port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
HDPE floats with foam filled
Model Number:
floats for HDPE /uhmwpemud dredging pipes
Material:
Other, HDPE, foam ,UHMWPE
Specification:
according to the size of your pipe
Length:
0.5~3m

Shandong Buoy & Pipe Industry Co., Ltd.

Business Type: Manufacturer,Trading Company
Liaocheng Shandong China
Main Products: UHMWPE Products Pipes ,Buoy and Light House

Product Details

Name:   HDPE float for slurry dredging project

 

Product Description

 

Introduction on HDPE floats for slurry dredging project

We all know that in a dredging project , especially on the sea, if we only use UHMWPE pipe or steel pipe, they can not float on the sea, so we need to match the HDPE dredging floats.

Material:HDPE material, inside with foam filled.

HDPE floats for slurry dredging project

 

Dimension of of the HDPE floats for slurry dredging project:

Pipe I.D mm 

Pipe thickness mm

I.D of float

 mm

O.D of float

 mm

Length of float 

mm

Thickness

mm 

Net buoyance

Note 

350

6

375

1000

1000

6.5

1100

Two pieces 

414

8

430

1200

1200

6.5

2200

Two pieces 

450

8

480

1300

1300

7

2300

Two pieces

500

8

530

1300

1500

7

2600

Two pieces 

550

10

580

1400

1600

8.5

3200

Two pieces 

600

10

630

1450

1700

9

3800

Two pieces 

650

10

680

1550

1800

9

4020

Two pieces

700

12

730

1530

1940

10

4300

Two pieces 

750

12

780

1700

1900

10

5400

Two pieces 

800

15

830

1800

2000

12

6100

Two pieces 

850

15

880

2000

2500

14

9200

Two pieces 

900

15

930

2100

2500

14

11000

Two pieces 

900

18

940

2100

2500

14

12000

Two pieces 

 

HDPE floats for slurry dredging project structure:

HDPE floats for slurry dredging project

 

 

 

 

 

       

Our Services

 

Business items:

 

Payment: 1, we prefer 100% fore T/T best, and if the total contract amount is below 50,000usd, we only accept 100% fore T/T .

        2, If the contract amount is great, we can accept your 30%fore t/t as deposit, and you can balance the left 70% with L/C.

        3, We can also use alibaba Escrow.

        4, if you have a much more better idea on the payment, we can communicate together.

 

Package: Pack in the container directly.

 

Delivery time: depends on you quantity.

HDPE floats for slurry dredging project

        

 

 

 

 

 

Contact Supplier

Ms. Clare Zhang Manager Chat Now
Telephone
86-0635-5085878
Mobile
18963565106
Fax
86-0635-5081123
Address
No.36 Huanghe Road Economic Development Zone Liaocheng,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Rubber & Plastics > Plastic Products > Plastic Tubes
Categories
Hi~