hot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steel

hot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steel

USD $2,500 - $3,300 /Metric Ton

Min.Order:5 Metric Tons

Supply Ability:
500 Metric Ton / Metric Tons per Month
Port:
shenzhen
Payment Terms:
T/T

Quick Details View All >

Standard:
AISI, DIN, GB, JIS
Place of Origin:
Sichuan, China
Model Number:
D2/Cr12Mo1V1
Technique:
Cold Drawn
Application:
Die Steel Bar
Alloy Or Not:
Is Alloy

Dongguan Circle Four Metal Materials Co., Ltd.

Business Type: Manufacturer,Trading Company
Dongguan Guangdong China
Main Products: Plastic Mould Steel ,Hot Work Steel ,Cold Work Tool Steel ,Carbon Steel Plate ,Alloy Steel Plate

Product Details

Packaging & Delivery

Packaging Details:Raw packing or according to customer's requirement.
Delivery Detail:4~7days
 

Specifications

High carbon-chrome cold work steel  skd11/D2/1.2379: 
1.Thic:60-300mm* length: 2-4m or customize 
2.UT up to standard SEP 1921-84 Class C/c

 

General Information:

This steel with hardening air, oil and salts bath. It features good resistance and toughness for hot and cold treatments. Normally used for mould carrier frames, containers for pressure casting, sub-dies for extrusion of aluminum, plastic moulds.

 

 

Comparable Standards:

 

AISI/SAEDINW.Nr.AFNORJISBSSIAUGB,YB

D2

X155CrVMo12-11.2379Z160CDV12SKD11BD2KORVCr12Mo1V1

 

 

Chemical Analysis (%): 

CMnSiCrVMoPS
1.50-1.600.15-0.450.10-0.4011.0-12.00.90-1.100.60-0.80≤0.03≤0.03

 

Heat treatment

Isothermal annealing:

-   Heat to 870÷880°C;

-   Furnace cooling to 760°Cand hold at temperature for at least 10 hours;

-   Cool by 10°C/h to 720°C;

-   Cooling in air.

Stress relieving:

To be carried out after machining and before the final heat treatment.

-   Heat to 650÷700°C, hold for 4/6 hours:

-   Furnace cooling to 330÷350°C;

-   Cooling in air.

Hardening:

-   Initial preheating to 350÷450°C;

-   Second preheating to 750÷850°C

-   Austenitizing at 1010÷1040°Cor at 1080÷1100°C;

-   Cooling in air or in oil if large parts.

Quenched hardness: 62÷66 HRC

Tempering:

    In the temperature range 150÷300°Cwith minimum holding time 3 h. For parts hardened at 1080÷1100°C, a first tempering will be carried out at 500÷550°Cin order to exploit secondary hardness, followed by a second tempering at 180/300°C. hot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steel hot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steel

hot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steelhot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steelhot sale steel Cr12Mo1V1(D2) high carbon-chrome cold work steel

Contact Supplier

Ms. JOEY ZHANG Sales Chat Now
Telephone
086-0769-85313622
Fax
086-0769-85313622
Address
changan Dongguan,Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Round Bars
Categories
Hi~