Reliable operation hot vibrating screencovering an small area
USD $5,000 - $8,000 /Set
Min.Order:1 Set
Xingyang Juxin Machinery Co., Ltd.
hot vibrating screen Introduction :
YK series of hot vibrating screen is a high efficiency vibrating screen produced by our company introduction of German technology .They have the features of strong excitation ,simple structure ,easy maintenance ;flexible connection ,smooth transport ,high screening efficiency ,large handling capacity ,long life span ,low power consumption and low noise .This series of vibrating sand screen are widely used in sand production line ,the screening classification of the materials from the gravel plant and stones factory .
hot vibrating screen Operation principle :
The motor make the exciter eccentric producing high-speed rotation through the triangle belt .The operation of the eccentric produce great centrifugal force ,exciting the screen box to do a certain amplitude circular motion .The materials on the sieve get the impulse from the screen box on the inclined screen surface to do continuous casting movement .During the process of encounter between materials and screen surface ,the granule smaller than the sieve will go through the sieve to achieve classification .
hot vibrating screen Features :
1 Used the eccentric block as excitation force ,strong excitation .
2 High strength bolt connection between sieve beam and screen box ,no welding .
3 Simple structure ,easy maintenance .
4 Use tyre couplings ,flexible connection ,stable operation .
5 High screening efficiency ,large handling capacity ,long life span .
Pre-sale:Enthusiastic
We offer you the early planing of the project,the best process flow design,choose the best appropriate equipment model to design products according to your special needs.
After-sale:Considerate
To establish good business relationship,we adopt periodical visit to the users.We could give you the definite reply during 24 hours when the users meet some problems in the producing process.
Attention
1.We should install the machine under shelter from rain and do not put it in the open air directly.
2.Electric motor should be installed in the rear of the crusher and the direction of rotation should be consistent
with the crusher. Reverse is forbidden.
3.The machine has six ground screws fixed on the concrete flood. The foundation need a place left for
discharging the ore stone and the scope is not less than 50°. The base form should be decided by the users
according the model of the feeder and transportation facilities.
4.Before debugging the equipment, we should tighten the screws and connect parts and check the lubrication
conditions.
5.After launching, the machine should reach normal speed before feeding. The material should be inserted
from the front and do not from the side in case of overload caused the accident.
6.Feeding must be stopped before stopping the machine. Only all the material have been broken is spit out
entirely, stopping working is available.
Q:Payment
A:30% by TT as deposit on signing the contract, 70% by as final payment of balance after the client’s satisfactory inspection of the equipment prior to the goods leaving the factory.
Q: What about Warranty? what will we do if the machine is broken down
A: The warranty period for all of structural and mechanical equipment is one year. The warranty period for all electric motors is half one year. Wear parts are not covered by warranty unless the component part is found to be flawed.
Q: What should we need to do for if we want to get a best quotation
A: Hi, if you want us recommend a suitable type for you ,please let us know as follows:
1).the capacity (tons per hour )
2).feed size
3).raw materials
Q: What could you help me to do for the business ?
A: Many thanks for your trust , we can provide you with proposal chart for complete production lines,spot inspection and operator traning according to your demands and the conditions of applied spot , we can help you choose the right equipments ,drilling rig ,loader ,trucks ,excavators and so on for rotary washer for sand washing.
Q:Delivery time
A:Standard delivery time for stationary crusher plant is 30 days from receipt of deposit,the mobile crusher plant is 45 days.