Three drum dryer with competitive price
USD $1,000 - $1,000,000 /Set
Min.Order:1 Set
Xingyang Juxin Machinery Co., Ltd.
THREE DRUM DAYER FUNCTION
Three drum dryer is used for drying materials with a certain degree of moisture and granularity in concentrating, construction, and metallurgy and chemical plant. The rotary dryers are widely used for a wide variety of materials, easy-to-operate and easy-to-maintain.
THREE DRUM DAYER STRUCTURE
Mine drying machine is mainly composed of a rotary body, lifting plate, a transmission device, a supporting device and a sealing ring and other components. With reasonable structure, well made, high output, low energy consumption, easy operation etc.
THREE DRUM DAYER WORKING PRINCIPLE
Wet material in the cylinder after being sent to dryer, inverted plate for turning, the material in the dryer is uniformly distributed and decentralized, and full contact with the hot air gradually from wet to dry. In the process of drying, the material on the plate with inclined and heat flow, adjustable motion to the dryer another piece, from the star type discharge valve discharge.
THREE DRUM DAYER ADVANTAGES
1 Adopted new combined-type feed and feed device, the center of second material without wind.
2 Cleaning, maintenance is convenient.
3 High heat efficiency.
4 Phenomenon of drying.
5 Reliable performance.
6 Transmission large and small gear pin can change gear, replaced the traditional gear of cast steel, saving the cost of investment, and also greatly reduces maintenance costs and time.
Pre-sale:Enthusiastic
We offer you the early planing of the project,the best process flow design,choose the best appropriate equipment model to design products according to your special needs.
After-sale:Considerate
To establish good business relationship,we adopt periodical visit to the users.We could give you the definite reply during 24 hours when the users meet some problems in the producing process.
Attention
1.We should install the machine under shelter from rain and do not put it in the open air directly.
2.Electric motor should be installed in the rear of the crusher and the direction of rotation should be consistent
with the crusher. Reverse is forbidden.
3.The machine has six ground screws fixed on the concrete flood. The foundation need a place left for
discharging the ore stone and the scope is not less than 50°. The base form should be decided by the users
according the model of the feeder and transportation facilities.
4.Before debugging the equipment, we should tighten the screws and connect parts and check the lubrication
conditions.
5.After launching, the machine should reach normal speed before feeding. The material should be inserted
from the front and do not from the side in case of overload caused the accident.
6.Feeding must be stopped before stopping the machine. Only all the material have been broken is spit out
entirely, stopping working is available.
Q:Payment
A:30% by TT as deposit on signing the contract, 70% by as final payment of balance after the client’s satisfactory inspection of the equipment prior to the goods leaving the factory.
Q: What about Warranty? what will we do if the machine is broken down
A: The warranty period for all of structural and mechanical equipment is one year. The warranty period for all electric motors is half one year. Wear parts are not covered by warranty unless the component part is found to be flawed.
Q: What should we need to do for if we want to get a best quotation
A: Hi, if you want us recommend a suitable type for you ,please let us know as follows:
1).the capacity (tons per hour )
2).raw materials
Q: What could you help me to do for the business ?
A: Many thanks for your trust , we can provide you with proposal chart for complete production lines,spot inspection and operator traning according to your demands and the conditions of applied spot , we can help you choose the right equipments ,drilling rig ,loader ,trucks ,excavators and so on for rotary washer for sand washing.
Q:Delivery time
A: Standard delivery time is 30 days from receipt of deposit,the special required machine is 45 days.