Aluminium Extrusion Automotive Spare Parts
USD $0.3 - $10 /Kilogram
Min.Order:500 Kilograms
Cosco (JM) Aluminium Co., Ltd.
Our advantages include:
1) Reliable quality (ISO9001:2008 & TS16949:2009 certified).
2) Competitive prices with short lead-time for both tooling and parts, because we do everything in-house.
3) Effective and strong technical support and excellent sales services.
4) Sufficient production capacity (only 65% occupied).
5) Efficient communication (48-hour quote lead time).
6) Compliant with RoHS Test.
Aluminium profile requirement:
Item | Original Product | Alternatives |
Standard for Extrusion | GB /T5237-2000 | EN-755-2/3/6/8, BS-1474, BS 1161 |
Standard for Fabrication | GB/T1804-92 | BS 8118 |
Standard for Anodizing | GB5237.2-2004 | BS1615:1987 |
Standard for Hard Anodizing | Not required | BS5599:1993 |
Standard for Powder coating | Not required | GB5237.4-2004 |
Working/Service procedure | Die designing→Die making→Smelting&alloying→Extruding→Cutting→CNC machining→Driling→Tapping→Surface treatment→Welding→Assembling→Packing→Shipping→After Sale Service | |
Quality oriented | ISO 9001:2008 TS16949:2002 | |
Documents | Mill Certificates, RoHS, REACH(SVHC), Working Instructions, Inspection Instructions, Packing Instruction, PPAP(including Control Plan, PFMEA etc.), Unpacking/unloading Instructions for customers. | |
Packing Method | 1,Standard packing:plastic sheet wrapped for each profile in order to protect the profiles' surfaces,kraft paper wrapped in bundles. 4. EPE+carton boxes. | |
Loading Weight | 20'GP for 13tons, 40'GP for 20tons. LCL shipment will be acceptable. |
Order,payment terms and shipment:
Minimum order | 500kg per trial order.One piece of sample free of charge provided by approval and kept for future mass productin inspection,delivery fees on buyer. |
Production Capacity | 50,000 MT/Year |
Tooling | Available |
Sample Lead Time | 15-25working days include 7-10 days making tooling if it's necessary |
Production Lead time | 15- 25 working days after deposit |
Payment term | Tooling:100% prepaid by wire transfer. Parts:30% upon order confirmation and balance before delivery by T/T. Other payment terms can e discssed. |
Shipping terms | FOB,CIF or others can be discussed. |
Factory photos
Pls contact us for more detail information !
Look forward to meeting you at our following trade fairs
ALUMINIUM 2014, Messe Dusseldorf, Germany
Date:2014-10-07~09
Booth No.: Hall H12 No.12M20/17
Website:
2014 China Sourcing Fair: Electronics & Components
Date: 2014-10-11~14
Booth No.: 11M40
Website: /
2014 China Import and Export Fair (Canton Fair) Autumn Version - Phase 1
Date: 2014-10-15~19
Location:China Import and Export Fair Complex (No. 380, Yuejiang Zhong Road, Guangzhou, Guangdong Province, China)
Website: /cn/
2014 China Import and Export Fair (Canton Fair) Autumn Version - Phase 3
Date; 2014-11-01~05
Location: China Import and Export Fair Complex (No. 380, Yuejiang Zhong Road, Guangzhou, Guangdong Province, China)
Website: /cn/
2015 China Sourcing Fair: Electronics & Components
Date: 2015-04-11~14
Booth No.: 9c42
Website: /