Direct access goods mezzanine floor shelf rack
Direct access goods mezzanine floor shelf rack
Direct access goods mezzanine floor shelf rack
Direct access goods mezzanine floor shelf rack
Direct access goods mezzanine floor shelf rack
Direct access goods mezzanine floor shelf rack

Direct access goods mezzanine floor shelf rack

USD $30 - $102 /Set

Min.Order:1 Set

Supply Ability:
6000 Set / Sets per Month
Port:
Shenzhen
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Place of Origin:
Guangdong, China
Brand Name:
Smaco
Model Number:
SM0062
Type:
Multi-Level
Material:
Other, Steel, Steel/Iron
Feature:
Corrosion Protection

Guangdong Smaco Automation Technology Co., Ltd.

Business Type: Manufacturer
Dongguan Guangdong China
Main Products: Heavy Duty Racking ,Medium Duty Racking ,Mezzanine ,Drive In Racking ,Cantilever Racking

Product Details

Floor Rack,Floor platform

 

 

 

 

 Product name

 Mezzanine floor/ Floor platform

 Brand name

 Smaco

 

 Features

 

1) With composite racking structure, patented light-steel floor panel structure;

 2) Floor panel with large load capacity, low cost, quick construction;

 3) Can be designed into one layer or multi-layers according to actual situation;

 4) Ensures fullest space utilization;

 5) Provides direct access to all pallets;

 6) Surface: Powder coated or galvanized and color optional;

 7) General ways of transportation from 2nd floor to 3rd floor: Manual, elevating table, hoisting machine, conveying belt, forklift truck;

 8) Can be designed according to clients' requirements;

 9) Loading capacity: 300--1000kg/sqm.

 

 Advantages

 

1) Color and size can be extended and adjusted according to you requirement;

2) High quality and good appearance;

3) Easy to install and dismantle;

4)This type of rack has good loading ability and can be assembled  and disesteemed easily;

5)Apply to handle the medium goods by manpower;

6)The reliable and efficient service before and after deal.

 Material quality

 High gradeQ235B Steel

 Surface treatment

 Epoxy powder coated and color optional 

 Payment term

 

30% deposit, the balance against copy of BL

Or 100% irrevocable L/C at sight

 

 Delivery time

 Delivery time: 21 days after T/T deposit or L/C at sight

 Loading port

 Shenzhen/Guangzhou, China

 Supply ability

 8000 sets per month

 

 Quotation

 

Please offer us the following information in details, so we can give you the exact quotation: 

1)Demission of you warehouse(L*W*clear height);

2) Loading capacity of each square meter

3) The decking: steel grating (stamping steel grating, smooth grating, punched grating or plywood

 

 

 

Direct access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rack 

Direct access goods mezzanine floor shelf rack

Direct access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rack

Direct access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rack

Direct access goods mezzanine floor shelf rack

Company Information

About Guangdong Smaco Automation Technology Co.,Ltd.

  • A leading & professional manufacturer of storage shelving & racking in China. 
  • More than 15 years experience in the field of producing storage metal racks
  • Our factory covers over 30, 000 square meters.
  • More than 100 professional and experienced staffs. 
  • Over 50 exclusive manufacturing machines and equipment. 
  • Production capacity up to 1,000 tons every month. 

Thousands of projects with shelving & racking have been built around the world.

Direct access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rackDirect access goods mezzanine floor shelf rack 

 

Cooperation procedur
  • First send us an inquiry for quote, please be specific follow information: 
  • Size: length, depth, height of rack
  • Loading capacity per level
  • How many levels
  • Would you want to put pallets onto Box Beams or put Metal Panels onto Metal Panels?
  • Order quantities 
  • Then we will response to you within 24hours with quotation sheet, including picture, description, product’s size, CBM, Weight, unit price in USD; Payment terms and delivery time and a copy of clearly catalogue for your reference. 
  • We may contact you for clarification or options during this period, please carefully review our quote, please do not hesitate to call or email us if you have any question or need any advice, make necessary revisions. 
  • After confirming all the information by you, we will send you PI (Proforma Invoice) or Purchase Agreement for your confirmation. Please pay money to our bank account according to the information in our PI. 
  • Once receiving 30% deposit, we will start producing at once. When the goods are finished, we will take all the pictures from different angles for you reference. After receinving 70% balance, we will arrange shipment at once. Finally we will send the Commercial  Invoice, Packing list, the Original B/L, C/O if needed to you.
FAQ

Before buying, please read it carefully. 

1. Transportation: 

(1) port of loading: Mainly ship from shenzhen port / or other your demand 

(2) Shipping Services: By sea, By air ,By train

(3) Other destination please do not hesitate to send the email to me get the answer. 

2 .Q: What is the Shipping Cost?

A: The shipping cost is determined by the destination port, weight, packing size, total CBM of the goods. It is difficult for us to quote the exactly shipping fee without knowing your total quantity of the order and your destination sea port. The freight is varied in different months. We have cooperated with shipping companies for more than 10 years, so we are able to offer the best freight and insurance to you if needed. 

3. Q: What is your MOQ?

(1) if customer has agent in China to arrange the delivery for you, there will be no MOQ limited, that means customer can order 1 set and the price will be offered as Ex-factory price. 

4. Q: What is the Lead Time? 

A: Normally it costs 7-25 days once receiving 30% deporit. Kindly please scan bank slip to us after payment.

5. Q: What is the Payment Terms ?

A: 30% deposit and 70% balance against delivery by (T/T, cash, western union, paypal or L/C).

Contact Supplier

Ms. Icy Chiang sales manager Chat Now
Telephone
86-0769-38944139
Mobile
8613929420082
Fax
86-0769-88121509
Address
Shangdi industrial district, Liaobu town Dongguan,Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Service Equipment > Store & Supermarket Supplies > Stacking Racks & Shelves
Categories
Hi~