Storage logistics equipments light duty racking system
USD $75 - $300 /Set
Min.Order:10 Sets
Guangdong Smaco Automation Technology Co., Ltd.
Storage logistics equipments light duty racking system
Any pallet can be loaded and unloaded freely;
Orderliness, normative, good-looking, easy to manage, higher efficiency.
1. Features: |
|
2. Load Capacity & Dimension: |
|
3. Main Parts Specs: |
|
4. Material: |
|
5. Surface treatment |
|
7. Certificate. |
|
Other useful information:
Pls kindly inform us the below information for us make a quotation:
1. AUTO CAD drawings (if not available,we could provide your requirement to our designer to design the racking system for you)
2. Width, height, length of the shelf
3. Size of your warehouse
4. How many bays and layers you need?
5. Loading capacity of each layer
6. LAR Color you want
Light Medium Duty Racking
1.Simple structure, nice figure, disassembles easier.
2. Freely adjusted, the layer could be steel plate or wooden plate, access goods via pallet or manual work.
3.It consist of steel plate ,upright ,Row spacer,Beam,Divided panel,Brand, Diagonal beam ,Base plate , Back mesh ,Horizontal Beam, Side palte
4. Loading capacity: 300-500kg/pallet
5. Packing: By bubble, box pack or as per your request.
6. Payment: TT, LC, West Union
7.The layer could freely adjusted
Length(mm) | 1200 1500 1800 2000 2200 2300 2500 3000 | |
Width(mm) | 400 450 500 600 800 | |
Height(mm) | 1200-5000 | |
Capacity of each layer (kg) | 200-800 | |
Size of upright(mm) | 55×58×1.5 Pitch=50 | Height 1.0m-3.0m |
Upright and beams connected / baseplate
Safty lock keep protect the beam from getting out from the upright holes.
SPECIFICATIONS:
Upright and beam specifications: we choose the right size of uprights and beams according to your loading capacity.
<
Other Useful information : | ||||||
1.Material : Q 235 B | ||||||
2.Features: Easy assemble and disassemble; Layer Distance: 50/75 mm can be freely adjusted; Apprance: Electro Static Dusting Spray | ||||||
3.Quality Guarantee : 3 Years from the delievery date | ||||||
4.Origin: Dongguan,China | ||||||
5.Lead Time : Usually 15 Work Days | ||||||
6.Payment: 40% T/T in advance and balance before shipment | ||||||
7.Packing: All the component is packed by Bubble Film at each end of part | ||||||
8.Factory Audit (Acceptable or Not): Acceptable | ||||||
9.Validity: 10 days |
CE Certifecation: