steel Q235b Material heavy duty rack Warehouse Rack Use
Negotiable /Set
Min.Order:1 Set
Guangdong Smaco Automation Technology Co., Ltd.
feature:
1) Easily assembled, Layers can be adjusted as required
2) Especially design for warehouse
3) Prime quality with very stable construction
4) Different colors for choice
Please simply offer us your requirement, in order to quote the right price:
a) Size: L ______ * W______ * H________mm
b) How many levels you need?
c) The loading capacity: _____kg /level
d) Need any decking table ( not suggest for the high level heavy duty rack, canbe replaced by support beam)?
e) How many first unit and add-on unit? (or simply offer us your warehouse drawings, we have the professional design team to help)
About SMACO
SMACO INFORMATION
Cooperation procedure:
About Guangdong Smaco Automation Technology Co.,Ltd.
Thousands of projects with shelving & racking have been built around the world.
Before buying, please read it carefully.
1. Transportation:
(1) port of loading: Mainly ship from shenzhen port / or other your demand
(2) Shipping Services: By sea, By air ,By train
(3) Other destination please do not hesitate to send the email to me get the answer.
2 .Q: What is the Shipping Cost?
A: The shipping cost is determined by the destination port, weight, packing size, total CBM of the goods. It is difficult for us to quote the exactly shipping fee without knowing your total quantity of the order and your destination sea port. The freight is varied in different months. We have cooperated with shipping companies for more than 10 years, so we are able to offer the best freight and insurance to you if needed.
3. Q: What is your MOQ?
(1) if customer has agent in China to arrange the delivery for you, there will be no MOQ limited, that means customer can order 1 set and the price will be offered as Ex-factory price.
4. Q: What is the Lead Time?
A: Normally it costs 7-25 days once receiving 30% deporit. Kindly please scan bank slip to us after payment.
5. Q: What is the Payment Terms ?
A: 30% deposit and 70% balance against delivery by (T/T, cash, western union, paypal or L/C).