Make & design in China metal storage rack
USD $10 - $380 /Set
Min.Order:10 Sets
Guangdong Smaco Automation Technology Co., Ltd.
Warehouse Cantilever Rack
1) Cantilever racking system is optimal for the storage of long-shaped and bulky materials, profiles, pipe, timber and moulding etc.;
2) Constructed of structural H steel and traditional roll-formed style both are available
3) Single and double sided configuration available;
4) Different column and arm sizes available to suit various loading requirement;
5) Bolted arm and base connection;
6) Surface treatment: Antistatic powder coating
7) Packing: Neutral paper box or in bulk or upon client’s requirements;
8) Different size available;
9) Container load:10-15 ton per 1x20ft container, 20-25 ton per 1x40ft container
10) Delivery time: 15 days for 1x20ft container, 20 days for 1x40ft container
11) Payment terms: By TT or sight LC;
Other useful information:
Accessories: we provide necessary component
Warranty: 3 years guarantee from the delivery date
Lead time: within 15 days
MOQ: 10 Sets
Production capacity: 6000 tons/month
Please inform us the listed information in your inquiry for a quick quotation:
1) AUTOCAD drawings(If not available, we can provide). We can design your racking system for free according to your requirements.
2) Size of your warehouse.
3) Width, depth of shelving.
4) Height of shelving system.
5) How many bays you want.
6) How many layers you want.
7) Loading capacity of each layers.
8) RAL color you want.
About Guangdong Smaco Automation Technology Co.,Ltd.
Thousands of projects with shelving & racking have been built around the world.
Before buying, please read it carefully.
1. Transportation:
(1) port of loading: Mainly ship from shenzhen port / or other your demand
(2) Shipping Services: By sea, By air ,By train
(3) Other destination please do not hesitate to send the email to me get the answer.
2 .Q: What is the Shipping Cost?
A: The shipping cost is determined by the destination port, weight, packing size, total CBM of the goods. It is difficult for us to quote the exactly shipping fee without knowing your total quantity of the order and your destination sea port. The freight is varied in different months. We have cooperated with shipping companies for more than 10 years, so we are able to offer the best freight and insurance to you if needed.
3. Q: What is your MOQ?
(1) if customer has agent in China to arrange the delivery for you, there will be no MOQ limited, that means customer can order 1 set and the price will be offered as Ex-factory price.
4. Q: What is the Lead Time?
A: Normally it costs 7-25 days once receiving 30% deporit. Kindly please scan bank slip to us after payment.
5. Q: What is the Payment Terms ?
A: 30% deposit and 70% balance against delivery by (T/T, cash, western union, paypal or L/C).