Outdoor Basketball Court Flooring
Content
1. Surface Preparation
2. Required Materials
Multi-layer
The materials used for the ColorPlus System for Concrete Substrate are as follows:
Primer
Level Master
Coating
Line Paint
Many colors to choose
3. Application of Primer
It is suggested to apply only 1 coat of Primer.
The undiluted coverage rate is approximately 0.15kgs per square meter, per coat.
The practical quantity depends on the smoothness of the surface.
4. Application of Level Master
It is suggested to apply minimum 2 coats of Level Master.
The undiluted coverage rate is approximately 0.25kgs per square meter, per coat.
The practical quantity depends on the smoothness of the surface and the different sizes of the added sand.
5. Application of Coat
It is suggested to apply 3 times of Coat.
The previous two coats is incorporated with sand (texture coat), the third coat can be applied directly (finish coat).
The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs per square meter, per coat, added with Base: 0.096kgs per square meter, per coat, while the undiluted coverage rate for the finish coat is approximately 0.15kgs per square meter, per coat.
The practical quantity depends on the different sizes of the added sand.
6. Application of Line Paint
It is suggested to apply 1 coat of Line Paint.
Approximately 3.75kgs is needed for a standard tennis court.
Package
plastic bucket for base material
iron bucket for level master
7. Completion
Courts can only be put into use after 24 hours when the work comes to an end.
Upon completion, the constructor shall insure proper removal of all construction debris, surplus materials, empty containers and wash water, and shall leave the site in a condition acceptable to the owners.
The court is to be left secure so as to prevent vandalism