badminton court flooring materialrial

badminton court flooring materialrial

Negotiable /Square Meter

Min.Order:1000 Square Meters

Supply Ability:
10000 Square Meter / Square Meters per Month
Port:
Jiangmen

Quick Details View All >

Place of Origin:
China
Brand Name:
BOLIPAI
Sport:
Other

Jiangmen Bolipai Glass Products Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer
Jiangmen Guangdong China
Main Products: basketball stand ,basketball system ,basketball backboard ,table tennis table

Product Details

Specifications

badminton court flooring material

 

acrylic acid court sport 

 

Content

1. Surface Preparation 

2. Required Materials 

Multi-layer

 

 

 

 The materials used for the ColorPlus System for Concrete Substrate are as follows:

  Primer 

  Level Master 

  Coating 

  Line Paint

 

  Many colors to choose

 

3. Application of Primer

 

It is suggested to apply only 1 coat of Primer. 

The undiluted coverage rate is approximately 0.15kgs per square meter, per coat. 

The practical quantity depends on the smoothness of the surface.

4. Application of Level Master

It is suggested to apply minimum 2 coats of Level Master. 

The undiluted coverage rate is approximately 0.25kgs per square meter, per coat. 

The practical quantity depends on the smoothness of the surface and the different sizes of the added sand. 

 

 5. Application of Coat

It is suggested to apply 3 times of Coat. 

The previous two coats is incorporated with sand (texture coat), the third coat can be applied directly (finish coat). 

The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs per square meter, per coat, added with   Base: 0.096kgs per square meter, per coat, while the undiluted coverage rate for the finish coat is approximately 0.15kgs per square meter, per coat. 

The practical quantity depends on the different sizes of the added sand. 

 

6. Application of Line Paint

It is suggested to apply 1 coat of Line Paint. 

Approximately 3.75kgs is needed for a standard tennis court.

Package

plastic bucket for base material

iron bucket for level master

7. Completion

Courts can only be put into use after 24 hours when the work comes to an end. 

Upon completion, the constructor shall insure proper removal of all construction debris, surplus materials, empty containers and wash water, and shall leave the site in a condition acceptable to the owners. 

The court is to be left secure so as to prevent vandalism

 

badminton court flooring materialrial

 

badminton court flooring materialrial

Contact Supplier

Mr. wukui liu Chat Now
Telephone
0086-0750-3901221
Mobile
13923086278
Fax
0086-0750-3133166
Address
YuanMeiLi Industrial Area,HuangBian Village, PengJiang District, JiangMen City, GuangDong, China Jiangmen,Guangdong

You May Like

New Products

Find Similar Products By Category

Sports & Entertainment > Artificial Grass & Sports Flooring
Categories
Hi~