galvanized steel trunking .free OEM.with UL CE tested
USD $1 - $9.5 /Meter
Min.Order:1 Meter
Shanghai Hdmann Industry Co., Ltd.
HDMANN CABLE LADDER TRAY SYSTEM
HDMANN cable trunking is constructed of precision engineered, high quality, welded steel wire and is the result of decades of research gained from the installation of hundreds projects across the globe.
Our cable ladder is subjected to testing at every stage of the manufacturing process. In actual use, it has performed in a wide variety of office buildings and is widely used for from heavy power cable pathways on oil drilling platforms to data installation above the ceiling.
Standard Cable ladders are alailable in depths of 25-150mm, and in a variaty of widths, ranging from 30-1000mm and thickness are 1.5-3mm. The standard finish is electroplared zinc after fabrication. A variaty of other finishes available are including hot dipped galvanized after fabrication, pre-galvanized as well as multitude of colors in powder coating. The cable trunking is also available in type 304 and 306 stainless steels for extremely corrosive enviroments.
As for the cable ladder installation, a complement of accessories and brackets used for cable trunking installation are provided. See our catalogue unpon request.
CABLE TRUNKING STANDARD SPECIFICATION
Table of cable trunking standard dimension&weight(kg/meter) | |||||||
W*H/Thick(mm) | 0.8 | 1 | 1.2 | 1.5 | 2 | 2.5 | |
50*50 | Lid | 0.53 | 0.66 | 0.79 | 0.99 | 1.32 | 1.65 |
Trunking | 1.17 | 1.48 | 1.78 | 2.23 | 2.97 | 3.71 | |
75*50 | Lid | 0.69 | 0.87 | 1.04 | 1.3 | 1.73 | 2.16 |
Trunking | 1.35 | 1.69 | 2.03 | 2.54 | 3.38 | 4.23 | |
100*50 | Lid | 0.86 | 1.07 | 1.29 | 1.61 | 2.14 | 2.68 |
Trunking | 1.52 | 1.9 | 2.28 | 2.84 | 3.79 | 4.74 | |
150*50 | Lid | 1.19 | 1.48 | 1.78 | 2.23 | 2.97 | 3.71 |
Trunking | 1.85 | 2.31 | 2.77 | 3.46 | 4.62 | 5.77 | |
200*50 | Lid | 1.52 | 1.9 | 2.27 | 2.84 | 3.79 | 4.74 |
Trunking | 2.18 | 2.72 | 3.26 | 4.08 | 5.44 | 6.8 | |
250*50 | Lid | 1.85 | 2.31 | 2.77 | 3.46 | 4.62 | 5.77 |
Trunking | 2.5 | 3.13 | 3.76 | 4.7 | 6.26 | 7.83 | |
300*50 | Lid | 2.18 | 2.72 | 3.26 | 4.08 | 5.44 | 6.8 |
Trunking | 2.84 | 3.54 | 4.25 | 5.32 | 7.09 | 8.86 | |
350*50 | Lid | 2.51 | 3.13 | 3.76 | 4.7 | 6.26 | 7.83 |
Trunking | 1.98 | 3.96 | 4.75 | 5.93 | 7.91 | 9.89 | |
400*50 | Lid | 3.54 | 4.25 | 5.32 | 7.09 | 8.86 | |
Trunking | 4.37 | 5.24 | 6.55 | 8.74 | 10.92 | ||
450*50 | lid | 3.96 | 4.75 | 5.93 | 7.91 | 9.89 | |
Trunking | 4.78 | 5.74 | 7.17 | 9.56 | 11.95 | ||
500*50 | Lid | 4.37 | 5.24 | 6.55 | 8.73 | 10.92 | |
Trunking | 5.19 | 6.23 | 7.79 | 10.39 | 12.98 | ||
550*50 | Lid | 4.78 | 5.73 | 7.17 | 9.56 | 11.95 | |
Trunking | 5.61 | 6.73 | 8.41 | 11.21 | 14.01 | ||
600*50 | Lid | 5.19 | 6.23 | 7.79 | 10.39 | 12.98 | |
Trunking | 6.02 | 7.22 | 9.03 | 12.03 | 15.04 | ||
650*50 | Lid | 5.6 | 6.73 | 8.41 | 11.21 | 14.01 | |
Trunking | 6.43 | 7.71 | 9.64 | 12.86 | 16.07 | ||
700*50 | Lid | 6.02 | 7.22 | 9.03 | 12.03 | 15.04 | |
Trunking | 6.84 | 8.21 | 10.26 | 13.68 | 17.1 | ||
750*50 | Lid | 6.43 | 7.71 | 9.64 | 12.86 | 16.07 | |
Trunking | 7.25 | 8.7 | 10.88 | 14.51 | 18.13 | ||
800*50 | Lid | 6.84 | 8.21 | 10.26 | 13.68 | 17.1 | |
Trunking | 7.67 | 9.2 | 11.5 | 15.33 | 19.17 | ||
850*50 | Lid | 7.25 | 8.7 | 10.88 | 14.51 | 18.13 | |
Trunking | 8.08 | 9.69 | 12.12 | 16.16 | 20.2 | ||
900*50 | Lid | 7.67 | 9.2 | 11.5 | 15.33 | 19.16 | |
Trunking | 8.5 | 10.19 | 12.74 | 16.98 | 21.23 |
Finishes&materials: HDG, Pre-galvanized, Electronic-galvabized, Powder-coating, stainless steel 304/316, GI, Aluminium,FRP
Lenghth: Maximum 6000mm
Non-sandard sizes are available upon request.
CABLE TRUNKING FITTINGS
CABLE TRUNKING CLAMP/COUPLER&ACCESSORY
CABLE TRUNKING SHOW
CABLE TRUNKING PRODUCTION LINE
LOADING SITE
HDMANN INDUSTRY CO., LTD.---CABLE SUPPORT AND FRAMING SYSTEM
CHINA LEADING OEM SUPPLIER
HDMANN CERTIFICATION
What is the type of our bussines?
We are a exporter and manufacturer, and have factories in China.
What are the trading terms we practice?
Generally, we practice FOB/CIF/C&F and DAP.
What are the payment terms we accept?
T/T, L/C, 30% down payment and 70% against B/L, NEGOTIABLE
What is the delivery time?
Generally, it would take 10-20 days to finish the production for normal order quantity.
Can we provide the samples?
Yes, sample is free.