Oilseed Pretreatment and Prepressing Machine, Peanut Cleaning and Shelling Machine for Sale
USD $1,600 - $20,000 /Set
Min.Order:1 Set
Henan Huatai Cereals And Oils Machinery Co., Ltd.
2016 China Huatai Brand Best quality Bucket Elevator /Grain Bucket Elevator for Sale (TDTG Series)
China Hutai Brand BH series flat dryer/oil seed dryer/oil seed chain dryer/seed dryer large capacity
China Hutai Brand BH series oil seed plate dryer /Continuous working seeds dryer with ISO/CE
mini cooking oil refinery machine, edible oil refining machine with 1TPD, 2TPD, 3TPD
Pretreatment and prepressing section is a very important section before extraction.It will directly affect extraction effect.
The set of pretreatment and prepressing equipment includes cleaning,crushing,germ pressing,softening and prepressing sections and so on.
Oil Pretreatment Machine
Specification: 30~3000T/D
Sections:cleaning,crushing,germ pressing,softening and prepressing,etc.
Craft features:
1.Create good production enviroment
2.Minimize the total fat loss,increase oil yield and output and improve the quality of oil and cake&meal.
3.Comprehensively utilize impurities and offal.
4.Perfectly match extraction production line,design different production processes according to different materials.
Cleaning section
Shelling and crushing
Softening section
Flaking section
Prepressing section
Our Company
Henan Huatai Cereals And Oils Machinery Co.,Ltd. was founded in 1950,whcih is a large-scale oil machinery manufacturing enterprise integrating R & D, design, manufacture and installation as one of the major grain and oil machinery manufacturing enterprises in China.Our company headquartered located in Huaxiang County Industries,Henan Province,China,covering 100,000.00 square meters.
Quality and Service Commitment
Our company always put the interests of customers and product quality to the first place, and always adhere to the"no best, only better" as our purpose. We will be commitment to provide high quality products with perfect site services and after-sale service.
Now the specific commitments are as follows:
1.Ensure to timely provide complete sets of equipment and accessories.
2.Ensure that one-time installation debugging acceptance.
3.To provide high quality material with preferential price.
4.Priority to provide customer our new craftworks and products.
5.Free training technological operator to ensure the trained staff can operation independently.
6.In the installation process,we will appoint a installation supervision staff on the spot.
7.we will offer an experienced project manager, organize a good installation team for the work of field installation debugging.
8.After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation,to ensure that equipments can normal operate in full load conditions. We will provide all kinds of information and records according to the requirements of the bid. The qualified completion files will be provided to customers according to their requirements
within one month after acceptance.
9.In the warranty period, all because of the quality of products has caused the damage or failure of equipment, suppliers will take the responsibility for the free repair and replacing spare part.
Due to the damage caused by the customer,we only charge material costs for repair and replacement.
After the receipt of customers notice,we will suggests the method to solve problem within six hours,or send specialist to the site to solve the problem within twenty four hours.
Contact us