Low Power Consumption Cooking Oil Making Machine With ISO 9001
USD $2,000 - $25,000 /Set
Min.Order:1 Set
Henan Huatai Cereals And Oils Machinery Co., Ltd.
5TPH Palm Oil Press Machine, Palm Oil Processing Mill, Palm Oil Produce Machine
price list for 5TPH,10TPH, 25TPH FFB palm oil machinery press production plant line
price list of 5TPH,10TPH, 20TPH FFB palm oil fruit mill plant , fresh fruit bunch palm oil mill
whole production line for soybean processing equipment for high quality oil
Continuous and automatic 30tpd soybean oil refining production
Cooking Oil Making Machine
In order to produce cooking oil,customer usually need to build 3 workshops,Material Pretreatment Workshop,Oil Extraction Workshop and oil refining workshop.
Material Pretreatment Workshop
Raw Material---cleaning---stones removal---magnetic selection---crushing---softening---flaking---drying---to extraction workshop.
1.Use cleaning screen, stoner and magnetic selector to remove kinds of impurities.
2.Use crusher to crush soybeans into small pieces.
3.Use softening pot to soften soybeans to increase their plasticity.
4.Use flaking roll to roll soybeans into thin flakes to incrase the surface area,convenient for extraction.
5.Use plate dryer to adjust the temperature and moisture of soybean flakes suitable for extraction.
Oil Extraction Workshop
Main Process
1. Use rotocel extractor or loop extractor to extract oil with solvent to get miscella of solvent and oil.
2. Through twice evaporation and steam-stripping to separate solvent from oil and then get crude soybean oil according to their different boiling and volatility with evaporator and steam-stripping tower.
3. After extraction, wet meal with solvent will be desolventized to separate solvent,then dry meal can be used for feed.
4. Solvent from evaporation,steam-stripping and desolventizing can be recycled through condensation.
5.Exhaust gas can be recycled.
Oil Refining Workshop
Main Process
Crude soybean oil---degumming,water washing,drying---decolorization---deacidification---deodorization---finished soybean oil.
Henan Huatai Cereals And Oils Machinery Co.,Ltd. was founded in 1950,whcih is a large-scale oil machinery manufacturing enterprise integrating R & D, design, manufacture and installation as one of the major grain and oil machinery manufacturing enterprises in China.Our company headquartered located in Huaxiang County Industries,Henan Province,China,covering 100,000.00 square meters.
Usually we load the machines to 40' container in Qingdao port and we can deliver the cargoes within 45 days after customer confirm order.
Quality and Service Commitment | |
Our company always put the interests of customers and product quality to the first place,and always adhere to the"no best, only better" as our purpose. We will be commitment to provide high quality products with perfect site services and after-sales service. Now the specific commitments are as follows: | |
1. | Ensure to timely provide complete sets of equipment and accessories. |
2. | Ensure that one-time installation debugging acceptance. |
3. | To provide high quality material with preferential price. |
4. | Priority to provide customer our new craftworks and products. |
5. | Free training technological operator to ensure the trained staff can operation independently. |
6. | In the installation process,we will appoint a installation supervision staff on the spot. |
7. | we will offer an experienced project manager, organize a good installation team for the work of field installation debugging. |
8. | After the equipment field assembly and installation, we will be also responsible for the single equipment debugging, online debugging and Feeding trial operation,to ensure that equipments can normal operate in full load conditions. We will provide all kinds of information and records according to the requirements of the bid.The qualified completion files will be provided to customers according to their requirements within one month after acceptance. |
9. | In the warranty period, all because of the quality of products has caused the damage or failure of equipment,suppliers will take the responsibility for the free repair and replacing spare part. Due to the damage caused by the customer,we only charge material costs for repair and replacement. After the receipt of customers notice,we will suggests the method to solve problem within six hours, or send specialist to the site to solve the problem within twenty four hours. |