Chinese Double girder overhead travelling crane
USD $1,000 - $500,000 /Set
Min.Order:2 Sets
Shandong Xintai Qiangli Chain Co., Ltd.
Double girder overhead crane
introduction":
Lifting capacity | 5/10tons to 550/100tons.(Capcaty: 5T, 10T, 16/3.2T, 20/5T, 32/5T, 50/10T, 75/20T, 100/20T, 100/30T,125/30T, 150/30T, 160/32T, 200/50T, 400/80T, 550/250T.) |
Lifting height | 16m to 24m |
Span length | 10.5m to 31.5m |
Industril voltage | 380v 50hz 3ph (Rated) |
Classification | A5/A6 |
Speed | lifting speed: 0.8/8m/min Hoist trolley traversing speed: 2-20m/min crane traveling speed:5-50m/min |
Please note:the crane span length,speed can be designed according to customer's demand |
Application areas:
widely used in plants, warehouses, material stocks to lift goods or materials. It is
prohibited to use the equipment in the combustible, explosive to
corrosives environment
Safety feature:
Weight overload protection device,
Crane traveling limit switch,
Voltage lower protection function,
Emergency stop system,
current overload protection system,
Top quality long time bearing polyurethane materials buffer...
Quality Control:
All cranes must be pre-assembled and tested before leaving factory and offer
the certification of test.
Parameters of Double Beam Electric Overhead Cranes
Capacity (t) | Span(m) | Lifting height(m) | Lifting speed(m/min) | Max. Wheel load(KN) | Total power (KW) | Total weight(T) |
5t | 10.5-31.5 | 9 | 5/0.83 | 36.8-74.2 | 5.5-7.2 | 3.9-19.6 |
1t0 | 10.5-31.5 | 9 | 5/0.83 | 64-108.6 | 10.5-12.2 | 5.8-20.8 |
16t | 10.5-31.5 | 10 | 5/0.83 | 100-128 | 18.1-19.5 | 6.8-25.8 |
20t | 10.5-31.5 | 10 | 5/0.83 | 112-86.6 | 21.1-24.9 | 7.4-28.3 |
25t | 10.5-31.5 | 10 | 5/0.83 | 150-102.2 | 21.5-25.3 | 9.3-30.2 |
32t | 10.5-31.5 | 9 | 4/0.67 | 191-128.8 | 29-30.4 | 10.2-32.8 |
40t | 10.5-31.5 | 9 | 3.2/0.5 | 232-146 | 29-32.8 | 11-35.1 |
50t | 10.5-31.5 | 9 | 2.5/0.4 | 142-180.5 | 31.2-33.6 | 12.9-42.6 |
63t | 10.5-31.5 | 9 | 2.5/0.4 | 179-220.5 | 42-43.2 | 14.3-46.9 |
80t | 10.5-31.5 | 9 | 2/0.3 | 225-267 | 42-43.2 | 17-50.3 |