Aluminum formwork system with accessories of pin and wedge
Aluminum formwork system with accessories of pin and wedge
Aluminum formwork system with accessories of pin and wedge
Aluminum formwork system with accessories of pin and wedge
Aluminum formwork system with accessories of pin and wedge
Aluminum formwork system with accessories of pin and wedge

Aluminum formwork system with accessories of pin and wedge

USD $100 - $145 /Square Meter

Min.Order:1 Square Meter

Supply Ability:
1 Set / Sets per Month
Port:
Xingang
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Hebei, China
Brand Name:
DSY
Model Number:
DSY

Hebei Dongshengyuan Trading Co., Ltd.

Business Type: Manufacturer,Trading Company
Shijiazhuang Hebei China
Main Products: Wire Mesh ,Chain Link Fence ,Hexagonal Wire Mesh ,Razor Barbed Wire Mesh ,Welded Wire Mesh

Product Details

building accessories

Products details:

1. total system forms the complete concrete structure

2. convenient

3. easy operation

4. high quality

5. light and great flexibitity

6. durable, made of special alloy aluminum

7. no need for rehabilitation, no risk of rust and corrosion

8. fast installation owing to its special design

9. speed of construction-4-days each floor construction cycle.

10. Formwork can be re-used over 300 times.

11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

 

Ten Advantages of Aluminum Forming System  

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

8. Recyclable value

The used aluminum material is of greater recyclable value,several times higher than steel.

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

Comparison of Aluminum Formwork and Wood Formwork

 

NO.ReferenceAluminum FormwrkWood Formwork
1Material cost (Included Support)$183-216/m2$13--16/m2
2Turnarond times200times at least3-5times
3assembling and dismantling labor cost$3.6-4.2/m2$4.2-4.7/m2
4recovery value$67/m2$0.8/m2
5subtotal arifical materials$4.4-4.9/m2$7.5-8/m2
6leveling the wall plastering labor cost$0.4/m2$2/m2
7leveling the wall plastering material cost$0.3/m2$2.6/m2
8ergonomics20m2/day15m2/day
9final ecomic indicators$5.9-6.4/m2$12-13/m2
Picture Presentation

 

Component for Aluminum Formwork Panel

Jointing formwork --- wall formwork--- beam forms---- stair formwork ---- concreting --- quality checking---- formwork-stripping

Our Services

1. Any inquiries will be replied within 24 hours.

2. Professional factory for  20 years with advanced facility.

3. Quality guarantee

A. All products will have been strictly inspected by our inspector before packing.

B. Welcome you to our factory to supervise the production processing and inspect 

the goods quality at any time.

C. After receipt of the goods within 15 days, have any quality problem,you could raise an objection.

4. Fast delivery

A.Sample order in stock, will be delivery within 3 to 7 days.

B.The goods will delivery on time according to the contract.

5. Payment

T/T,  L/C, Western Union, Escrow.

6. Shipping

By sea, we also have strong cooperation with DHL, TNT, UPS, FEDEX, EMS. 

7. Best Service after-sales

Strong Team!  Best Quality!  High Integrity!  Commitment !

Company Information

Hebei Bangda Metal Produts Co.,ltd is responsible for the production and

Hebei Dongshengyuan Trading Co.,ltd is in charge of export business.The
two company as a whole, be short of one cannot.

     Hebei Dongshengyuan Wire Mesh Factory is a full service manufacturer of wire, woven wire mesh and wire processed products. Started since 1985, Dongshengyuan can supply good quality stainless steel wire mesh, chain link fence, vibrating screen wire mesh, fiberglass mesh, U type wire, PVC coated wire, wire mesh fences, expanded metal, perforated metal and various wire products.

 

    Dongshengyuan products are widely used in petroleum, rubber, building, auto industry, sifting of grains, filtration of air and liquid, etc. We export to USA, Germany, South Korea, Belgium, and Southeast Asian countries and have established long-term and friendly business relationship with our foreign customers.

 

    We have full range of production equipments, advanced technology, scientific management and inspection system and we can meet the exact requirements of our customers for various wire mesh products.

Aluminum formwork system with accessories of pin and wedge 

 Aluminum formwork system with accessories of pin and wedge

Contact Supplier

Ms. Wendy Kang Export Manager Chat Now
Telephone
86-311-87738119
Mobile
8613513377315
Fax
86-311-68009803
Address
Floor 9th,21st Building ,Hanlinguantianxia ,Hongqi Street ,Qiaoxi District Shijiazhuang,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Formwork
Categories
Hi~