astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe
astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe
astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe
astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe
astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe
astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

USD $400 - $550 /Metric Ton

Min.Order:10 Metric Tons

Supply Ability:
15000 Metric Ton / Metric Tons per Month
Port:
xingang tianjin
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Thickness:
0.7, 6.0
Section Shape:
Round
Outer Diameter:
18 - 219 mm
Place of Origin:
Tianjin, China
Secondary Or Not:
Non-secondary
Application:
Structure Pipe

Tianjin Ruijie Steel Pipe Co., Ltd.

Business Type: Manufacturer,Trading Company
Tianjin China
Main Products: Spiral Welded Steel Pipe

Product Details

 

Hot Rolled round steel pipe SCH40, ERW Steel Pipe size 1/2inch-8inch

 

Specification

 

DescriptionERW Steel Pipe
Outside Diameter 18mm-219mm/ 1/2inch-8inch
Wall thickness0.7-6.0mm
Length3m, 5.8m, 6m, 6.4m,7m, 8m
GradeQ195B,Q235B,Q345B
Main StandardGB/T3091-2008, ASTM A53-2007, ASTM A53M-2007, BS1387, BS EN10025
Quality guarantee accept the third party testing
EndsPlain, Bevelled,Threaded with coupling
International Standard Packingin bunldles with steel srip or in bulk
Applicationwire casing, greenhouse, scaffolding,bracket,water, sewage, gas, air, heating steam,building materials
Delivery Timewithin 20 days after receiving the deposit or L/C  
Port of LoadingTianjin, China
Detailed Images

 

Products Showing

surface: bare, oil, painting, PE Coating

ERW Pipe including:  scaffolding pipe, liquid pipe, bracket pipe, electrical wire casing pipe and fence pipe

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

 

Our Warehouse

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

Production Process

 

Raw material> Test>Split>Test> Shear & Weld> Storing> Forming> Welding> Fin Cutting>Sizing> Tube Forming > Flying Saw> Test> Packaging> Storage

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

hydraulic pressure testing

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

Packaging & Shipping

 

Standard Packing: in bundles with steel strip

 

Our professional loading can protect goods damaged.

When you place order, our factory will produce your goods at the first time.

Prompt delivery can make you win market advantage.

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

Factory

 astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

 

Tianjin Ruijie Steel Pipe Co.,Ltd  was established in 2005 and located in China famous steel pipe base - Daqiuzhuang . It attached to Ruijie Group which has fixed assets of 225 million dollars. Ruijie group company is the modernized large group company integrated steel pipe manufacture, anticorrosion & insulation, thermal company and international trade.

 

We mainly offer kinds of steel pipes,steel coils,steel sheets,scaffolding and nails. If you have any interest on other steel products, we would like to support you

 

Application

 astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

FAQ

 Q: Are you trading company or manufacturer ?
A: A: We are factory.

Q2. What is your terms of payment?
A: We can accept T/T,L/C,Alibaba trade assurance order

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF

Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.

Q6. What is your sample policy?
A: we could offer the sample for free charge but do not pay the cost of freight.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

Contact Us

 astm a53 erw black steel pipes/schedule 20 black steel pipe, thin wall black steel pipe

Contact Supplier

Mr. Aldrich Ma Foreign Trade Manage Chat Now
Telephone
86-22-27989909-802
Mobile
15822052105
Fax
86-22-27989919-817
Address
Cuijiazhuang Village, Dafengdui Town,Jinghai County Tianjin

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~