welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

USD $500 - $700 /Metric Ton

Min.Order:5 Metric Tons

Supply Ability:
15000 Metric Ton / Metric Tons per Month
Port:
tianjin port china
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Thickness:
0.8, 8.0
Section Shape:
Square
Outer Diameter:
20*20-100*100mm
Place of Origin:
Tianjin, China
Secondary Or Not:
Non-secondary
Application:
Structure Pipe

Tianjin Ruijie Steel Pipe Co., Ltd.

Business Type: Manufacturer,Trading Company
Tianjin China
Main Products: Spiral Welded Steel Pipe

Product Details

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe
S
Specification
 

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

Description

ERW Square & Rectangular Tube

Diameter

20*20-250*250mm

Wall thickness

0.7-6.0mm

Length

3m, 5.8m, 6m, 6.4m,7m, 8m

Main Standard               

GB/T3091-2008, ASTM A53-2007, ASTM A53M-2007, BS1387, BS EN10025                     

Surface Finish            

Bare, Paiting and Galvanized

Grade

Q195B,Q215B,Q235B,Q345B

Packing

Piece in bundles/ Bulk

Ends

Plain

Main Usage

Steel structure, mechanical manufacturing, construction,

bracket,Automobile manufacturing, ship building,fence. etc

Delivery Time

Within 20 days after receiving the deposit or L/C

Port of Loading

Tianjin, China

 
D
Detail Images
 

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe


welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

 
P
Production Process
 

Black Steel Tube manufacture procedures

Raw material> Test>Split>Test> Shear & Weld> Storing> Forming> Welding> Fin Cutting>Sizing> Tube Forming> Flying Saw> Test> Packaging> Storage

 
welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

Pre-galvanized steel pipe

zinc coating : 40-100gsm,  advantage : cheap price, good quality and beautiful surface

The pre-galvanized steel pipe takes the galvanized strip steel as raw material on required specification. After cutting the raw material will be welded with straight seam by the high frequency welding equipment. Meanwhite, the zinc supplemention will be done at the welded joint

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

Our Warehouse

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

 
P
Packing&Shipping
 

Standard Packing: in bundles with steel strip

Our professional loading can protect goods damaged.

When you place order, our factory will produce your goods at the first time.

Prompt delivery can make you win market advantage.

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

 
C
Certificates
 

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

 
F
Factory
 

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe

 

Tianjin Ruijie Steel Pipe Co.,Ltd  was established in 2005 and located in China famous steel pipe base - Daqiuzhuang . It attached to Ruijie Group which has fixed assets of 225 million dollars. Ruijie group company is the modernized large group company integrated steel pipe manufacture, anticorrosion & insulation, thermal company and international trade.

We mainly offer kinds of steel pipes,steel coils,steel sheets,scaffolding and nails. If you have any interest on other steel products, we would like to support you

 

welded rectangular pipe/tube / steel pipe,thick wall a36 steel pipe 

 
F
FAQ
 

Q: Are you trading company or manufacturer ?
A: A: We are factory.

Q2. What is your terms of payment?
A: We can accept T/T,L/C,Alibaba trade assurance order

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF

Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.

Q6. What is your sample policy?
A: we could offer the sample for free charge but do not pay the cost of freight.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

 
 

Contact Supplier

Telephone
86-22-27989909-802
Mobile
15822052105
Fax
86-22-27989919-817
Address
Cuijiazhuang Village, Dafengdui Town,Jinghai County Tianjin

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~