cooling tower pvc sheet spindle filler
USD $800 - $1,000 /Set
Min.Order:1 Set
Dongguan Carno Machinery Co., Ltd.
cooling tower pvc sheet spindle filler
1. cooling tower pvc sheet spindle filler adopts the high quality PVC fill, its peak nested fan lines to enhance cold heat exchange ability, and is worth by high temperature of 60 °C, water cooling effectiveness guarantee as to the best level. At the same time with high temperature resistant type water tower supply, is worth by 60-95 °C high temperature water, especially suitable for electric power industries
2. Fan of cooling tower pvc sheet spindle filler: axial flow fan, uses the advanced plastic, or aluminum alloy manufacture, every fan before they leave the factory will have been strictly set from small and balance test.
3. All metal main parts of cooling tower pvc sheet spindle filler: the thick body steel manufacturing, the international standard hot galvanized antirust processing, but also provides full stainless steel fittings
4. cooling tower pvc sheet spindle filler shell and chassis, are all acid alkali corrosion resistance of glass fiber reinforced plastic senior (FRP), all pipes and water spray equipment adopts advanced plastic, need not add the lubricating oil, ensure durability
1. Reference the operation quality of cooling tower pvc sheet spindle filler, and checking the safety coefficient of foundation bearing capacity. |
2. cooling tower pvc sheet spindle filler should not be installed on the smoke, heat, open flame. |
3. cooling tower pvc sheet spindle filler should not be installed on the presence of corrosive gas. |
4. cooling tower pvc sheet spindle filler of the vent and the distance between the obstacles should be more than 3 m. |
5. Circulating water pump suction part should be set below the position of the cooling tower pond water. |
oling tower pvc sheet spindle filler should be set pipeline stages, the cooling tower don't directly pipeline under weight. |
7.The function of cooling tower pvc sheet spindle filler circulating water related, should check whether the reach regulation |
8. Regularly check cooling tower pvc sheet spindle filler water level, water temperature, the motor power, voltage, and cooling tower vibration and noise, etc. |
9.Winter operation of cooling tower pvc sheet spindle filler should pay attention to not use ventilation window, easy is covered with ice and snow, cold water circulation,may cause the water system and packing frozen. |
Technical parameters of cooling tower pvc sheet spindle filler
Detailed of cooling tower pvc sheet spindle filler
Project case of cooling tower pvc sheet spindle filler:
Note:
1.T/T ,50% as deposite and the balance to be paid before shipment
2.With one year warranty
3.The machinery will be packed with standard wooden case
4.One unit in one international wooden case
5.Delivery time :About 20 days upon receipt of deposit
Thanks for your attention of our cooling tower pvc sheet spindle filler and welcome to visit our website and factory !