2015 Modern PVC Wall Mounted Bathroom Cabinet 9002
USD $120 - $134.9 /Set
Min.Order:10 Sets
Hangzhou Boman Sanitary Ware Co., Ltd.
Wall Mounted Bathroom Cabinet
2015 Modern PVC Wall Mounted Bathroom Cabinet 9002
Wall Mounted Bathroom Cabinet photo show
specifications
Wall Mounted Bathroom Cabinet
1.High gloss painting.
2.A grade ceramic basin.
3.Customized design.
Wall Mounted Bathroom Cabinet specification
Wall Mounted Bathroom Cabinet Material | 1) Mirror: 4/5mm silver glass mirror with/without light or mirror cabinet |
2) Wash basin: Ceramic/ Tempered Glass/ Resin | |
3) Cabinet: ,PVC | |
4) Counter top: Ceramic/ Artificial Marble/Tempered Glass/ Resin | |
Finishing | 1) No faucet |
2) Handle: stainless steel or aluminum alloy,kick board available | |
3) Different color available | |
Size | 1) Main Cabinet: 80*45*52cm;others size available |
2) Side Cabinet: 25*15*30cm | |
3) Mirror: 50*80cm | |
Package | 1)Export standard packing: wraped by plastic bag,protective foam against the products, strong double corrugated carton |
2) And then in a wooden case if needed | |
3) Packing for fragile products: protective foam against the products, reinforced by wood frame outside carton | |
4) Packing according to customer’s need | |
Features | 1) Made with high quality materials and painted in various colors, excellent in waterproof with competitive price. |
2) Strong sense of fashion style through the simple but practical design. With the installation of this bathroom vanity, this helps to save place. | |
3) The size and color for each part of the bathroom storage cabinet can be customized by your requirements. You will find the satisfying furniture for your bathroom. | |
MOQ for bathroom cabinets | 10 Sets/negotiable |
Delivery time | Sample is ready with 15days; Order is generally ready within 35days depending on trading volumes. |
Related products
Factory of Wall Mounted Bathroom Cabinet
1. Q: Where is your factory?
A: Our factory is located in No.100 Dangke road,Xiaoshan,Hangzhou city,Zhejiang province.
2.Q:How far away from Guangzhou and Shanghai?
A:About 2 hours by airplane from Guangzhou and 3 hours by high speed railway from Shanghai
3. Q: What is the normal lead time?
A: Most of the items can be delivery within 25 to 30 days.
4. Q: What is your payment term ?
A:30% advance T/T, 70% before shipment.
Not exactly what you want? 1 request,multiple quotations Get Quotations Now >>