High Volume Fiberglass Plastic Farm Water Tank With Air Vent
USD $130 - $300 /Set
Min.Order:1 Set
Hebei Fenjin Mining Machinery Co., Ltd.
Farm Irrigation Used Pressed Steel Sectional Water Tank With Hot Dip Galvanized Accessories
30 Degree Steel Trough Idler Brackets For Supporting Rollers
Long Lifespan Carbon Steel Troughed Bottom Trestles For Supporting Belt Conveyor Idler Roller
Flame Retardant Heavy Duty Impact Bed Cradle For Conveyor Loading Point
Flame Retardant UHMWPE Sheet Surface Belt Buffering Bed For Underground Coal Mine Industry
Industrial Heavey Duty 45 Degree Angle Trough Bracket For Supporting Idler Roller
High Volume Fiberglass Plastic Farm Water Tank With Air Vent
Farm Water Tank Introudction
SMC water tanks are constructed of panels from SMC (Sheet Molding Compound) by
hydraulic hot press under high temperature and pressure conditions to maintain the best endurance.
Easy installation with bolts assembly on siteand tank shape and volume can be freely designed with
no restrictions based on site location, weather or climate.
Farm Water Tank Properties
SMC WATER TANK DESIGN PARAMETERS | |
Tensile Strength | ≥70MPa |
Flexural Strength | ≥100MPa |
bending modulus | ≥7.0GPa |
Barcol Hardness | ≥60MPa |
Water Absorption | ≤1.0% |
Fiberglass content | ≥25 25% |
Light transmission | Nil |
Outdoor weathering(Natural sunlight) | Stabilized |
Toxicity | Nil |
Micro biological growth | Nil |
Farm Water Tank Features
---No leakage after filled with water
---Easy to install in any size at site
---Safe for good grade and drinking water storage
---Easy to increase or decrease the size
---Resistant to corrosion, high strength
---Long service life
Farm Water Tank Assembly
Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix top panels and if required, top support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.
Farm Water Tank Certifications
Farm Water Tank Accessories
Farm Water Tank Packaging & Shipping
1 ISO Management and BV audited company
2 Various style of FRP products for you choose, like frp water tank, frp grating, frp cooling tower, frp profiles, etc
3 We offer competitive price with good quality products
4 We have the most convenient transport and prompt delivery.
5 We supply good after-sales service, we will follow up each situation, if have problems, we will find out the reason and deal with positively.
Q: 1. Can I have a sample order?
A: Yes, sample is available. Mixed samples are acceptable.
Q: 2. What is the lead time?
A: Usually 7 days or according to quantity
Q: 3. What is the minimum order quantity?
A: Our MOQ is 1 set
Q: 4. What is the price policy of your company?
A: The price is different according to the order quantity , the more the cheaper.
For more detailed information, you can contact us freely
Q: 5. What is the package?
A: We offer pallets, wooden case, steel frame packaging, or according to customer's demand
Q: 6. Can I visit your company?
A: Welcome, look forward to your arrival and we will pick up you from Beijing airport and lead you to visit our factory