2014 Gold Mine Grinding Wet Pan Mill
USD $6,500 - $7,500 /Set
Min.Order:1 Set
Zhengzhou Titan International Trading Co., Ltd.
Wet pan mill is named after the diameter of roller.
1.Φ1300,Φ 1350,Φ 1400,Φ 1500,Φ 1600 is suitable for selection of iron ore, molybdenum ore ,lead ore ,zinc ore, antimony ore and so on.
2.Φ 850, Φ 900, Φ 1000,Φ 1100,Φ 1200 is suitable for selection of gold ore.
Principle: The main units include power devices, rack, basin, rollers : First, power transmits from the Motor to the Reducer. The torque is transmitted to the Central Driving Shaft through Reducer, and then transmitted to rollers through roller Connector. Rollers do counter-clockwise motion along the horizontal axis in the horizontal direction with its own rotation. The added ore materials will suffer the pressing and grinding from the mill, completely crushed. At the same time, with mud mixing function, the materials are thoroughly mixed with water evenly so that the pulp density and other indicators are steady. Mine fines are brought to the upper level in moving the slurry mix, which overflow though the discharge port on settings basin into the next step of processing operations. On the other hand, coarse minerals are deposited in the bottom of the pan to suffer grinding and smashing again and again until fineness meets the standard.
Model | Specification | Max Input size(mm) | Rotate Speed (r/min) | Powder(kw) | Weight(t) |
1600A | 1600×400×200×500±20mm | 3cm | 20-22 | 25KW | 14.5 |
1500A | 1500×350×200×460±20mm | 20-22 | 22KW | 13.3 | |
1500B | 1500×350×150×460±20mm | 20-22 | 22KW | 12.3 | |
1500C | 1500×300×150×420±20mm | 20-22 | 22KW | 11.3 | |
1400A | 1400×250×150×350±20mm | 16-18 | 18.5kw | 8.5 | |
1400B | 1400×250×150×350±20mm | 21-23 | 18.5kw | 8.5 | |
1350A | 1350×250×150×350±20mm | 16-18 | 18.5kw | 8 | |
1350B | 1350×250×150×350±20mm | 21-23 | 18.5kw | 8 | |
1300A | 1300×250×150×350±20mm | 16-18 | 15kw | 7.5 | |
1300B | 1300×250×150×350±20mm | 21-23 | 15kw | 7.5 | |
1200A | 1200×200×80×250±20mm | 17-19 | 7.5kw | 5.5 | |
1200B | 1200×180×80×250±20mm | 23-25 | 7.5kw | 5.5 | |
1100A | 1100×200×80×250±20mm | 17-19 | 7.5kw | 5 | |
1100B | 1100×180×80×250±20mm | 23-25 | 7.5kw | 5 | |
1000 | 1000×180×80×250±20mm | 13-15 | 5.5kw | 4.5 |
As their small investment, high yield, the production cost is low, good benefits, praised by users, domestic alternative to the ball mill equipment. Grind gold machine easy installation and maintenance, small investment, high yield, quick, low-cost production, is the ideal equipment for mine SMEs beneficiation.
Grind Gold Machine - wet pan mill Use and Maintenance
1.The normal operation of the wet pan mill, before they start feeding.
2, this machine prohibit strip start, the outage at boot time, you must first clean up the residual ore in the middle of the milled slot and then start.
3, should be uniform feeding not erratic, it is best to use the feeder.
Part
4, bearing frequent butter, gear box or car rear axle with frequent checks whether the loss of gear oil.
5, regular checks of the various parts of the screw is loose.
6.Found bearing damage must be promptly replaced, shaft eccentric avoid damage to other parts
7 mill runtime to pay attention to that the reducer or bearing part of the presence or absence of abnormal sound, whether the temperature is too high, the motor current is too large irregularities; should be shut down immediately if the above phenomenon, exclude.
8, machine maintenance, to ensure safety, you must remove the motor belt.