2TPH 10bar pressure chain grate type boilers burn biomass biomass or coal
USD $10,000 - $50,000 /Set
Min.Order:1 Set
Henan Yuanda Boiler Corporation Ltd.
complete data and steam out put efficiency of boiler run in coal or biomass
Best price offer based on FOB CIF biomass or coal boiler with specification
10tons per hour capacity coal fired boiler for textile industry
steam pressure 5 kg operated by biomass or coal as fuel 6 Ton capacity steam boiler
3.00 Metric Tons per hour coal or biomass Boiler and related accessories
1. Packaged boiler, fast installation, low operation cost with more choice of cheap biomass waste fuel, the most safety and practical boiler, popular selling all over the world
2. Take 2ton/hour capacity boiler as sample, the biomass fuel consumption is 163kg per hour, boiler efficiency achieved to 83%
3. Water tube type 3-pass boiler, double tank with higher and bigger furnace can make the fuel burned sufficiently
4. With advanced intelligence control system, achieve remote monitoring function, man-machine dialogue, easy to operate.
SZL boilers burn biomass biomass or coal pictures in our factory:
Q: Why customers prefer SZL series for coal or biomass fuel ?
1. Double drum water tube structure, ensure strong the water circulation
2. The fast pressure up, 4kg pressure up within 5 minutes;
3. Independent cyclone combustion chamber, as a secondary burning chamber, achieve completed combustion and dust separation;
4. The water-cooled arch design, support the furnace arch and make sure the furnace arch long life span, also speed up the water circulation;
5. The furnace volume is large, can make the coal burning sufficient, greatly save energy
SZL boilers burn biomass biomass or coal specfication form
More available Models, please contact Celia for more price and details
SZL2-1.25-ALL,SZL2-1.6-ALL,SZL2-2.5-ALL
SZL4-1.25-ALL,SZL4-1.6-ALL,SZL4-2.5-ALL
SZL6-1.25-ALL,SZL6-1.6-ALL,SZL6-2.5-ALL,
SZL8-1.25-ALL,SZL8-1.6-ALL,SZL8-2.5-ALL,
SZL10-1.25-ALL,SZL10-1.6-ALL,SZL10-2.5-ALL,
SZL15-1.25-ALL,SZL15-1.6-ALL,SZL15-2.5-ALL,
SZL20-1.25-ALL,SZL20-1.6-ALL,SZL20-2.5-ALL,
SZL25-1.25-ALL,SZL25-1.6-ALL,SZL25-2.5-ALL,
SZL30-1.25-ALL,SZL30-1.6-ALL,SZL30-2.5-ALL
Feeding system of SZL boilers burn biomass biomass or coal
Supply Cope of SZL boilers burn biomass biomass or coal
I. Boiler main part
II. Boiler accessories including below 1-14 items:
1. Draft fan
2. Forced fan
3. Electric control box
4. Valve & Gauge used on boiler main part
5. Grate speed reducer
6. Water pump
7. Steam dividing equipment
8. Smoke chimney
9. Smoke ducting
10. Economizer
11. Fuel feeder
12. Slag remover
13. Dry-type Dust Collector
14. Water treatment equipment
The above is standard; Other equipments are available, like Wet scrubber, air-preheater, deaerator, pressure tank, condensed water recycling equipment, heat exchanger etc.
Completed Accessories of SZL boilers burn biomass biomass or coal
Application industries of the boilers burn biomass biomass or coal:
1. Metal surface coating - plastic spraying paint after high temperature curing.
2. The pharmaceutical industry - wood drying herbs.
3. Grain drying, grain processing industry.
4. Food industry - biscuit baking, drying of instant noodles, noodle, conveyor dryer.
5. Wood processing industry - wood drying, fiberboard, plywood drying.
6. Textile printing and dyeing - printing drying, heat setting, hot air stenter.
7. Chemical industry - chemical raw material drying.
8. Automotive industry - tunnel dryer. and so on
Yuanda Boiler Packaging & Shipping, Trade Terms:
1. Way of delivery: by Sea or Railway or truck based on needs
2. Shipping model: by normal container and flat rack or bulk cargo based on goods, we can suggest the container
3. Customers specifying freight forwarders or we send bottom shipping price from our forwarder partner for your reference, negotiable shipping methods
4. Packing: nude for boiler main part in nude, accessories in export-use wooden box
5. Payment Terms: T/T, LC; 30% deposits; 70% balance before delivery.
How we make you assured of our products:
Quality Assurance
We Yuanda Boiler is a 58years old factory with qualification for boiler manufacturing and pressure vessel manufacturing.
All our products passed ISO9001:2000 International Quality System Certification.
Warranty
One-year warranty and full-life services with many considerate policies
Spare Services:
A full range of original equipment spares is immediately available for all Yuanda boilers, stokers, mills and other ancillary equipments. Some spares are produced in our own factory with fast supply
We provide free parts for some parts based on your needs.
Yuanda Boiler factory: established in 1956 with mature technology and experiences in boiler industry, main products:
If any needs of the above, pls feel free to contact Celia for price and details, thanks : )
Enterprise Concept: Quality, Sincerity, Creditability
We Yuanda Boiler have over 30years Experienced Engineer Team + 500ton/year Production Alibility
FAQ:
Q1: How to install a boiler?
A1: Yuanda Boiler provides completed installation drawing and manual, or send engineer abroad for installation guidance
Q2:How many years is the boiler’s life span
A2: The boiler is designed for 10years life span, but under good maintenance, usually the boiler can use at least 16years, Yuanda Boiler provide full life after-sales service to each sold boiler
Q3: How to choose a boiler model?
A3: Confirm the type (steam or hot water), capacity, pressure (or output temperature need) and fuel(coal, biomass, gas or oil) of the boiler, Yuanda Boiler will suggest a suitable model based on your usage
Q4: How is the warranty term?
A4: If any problems caused for quality during the warranty period, the Seller will repair or replace the broken parts for free, if the problem caused from the client’s side, the Seller will help supply the spare part at lowest cost.
Send your Inquiry Details in the Below, Click "Send" Now J
To get our completed boiler offer with detailed price list and technical specification