PVC Coated Umbrella Fabric for Car Parking Shade with PVDF
USD $1.6 - $8.3 /Meter
Min.Order:1500 Meters
Guangdong Yilong Advanced Material Technology Co., Ltd.
Double Side PVC Coated Fabric for Car Parking with PVDF
Specifications:
PVC Coated Fabric for Tensile Fabric Roofing ---- Knife PVC Coated Type
PVC Construction Membrane | ||||
Ref. Test Method | ||||
Item | 50902W2 | 51052W2 | 51152W4 | |
Weight | 900g/m2 | 1050g/m2 | 1150g/m2 | |
Denier | 1000Dx1000D | 1000Dx1000D | 2000Dx2000D | |
Density | 30*30inch | 30*30inch | 32*30inch | |
Lacquering | PVDF both sides | |||
Flame Retardancy Level | B1 | |||
Roll width | 3m | |||
Tensile Strength(N/5cm) | 4200/4000 | 4200/4000 | 5600/5000 | DIN53354 |
Tearing strength(N/5cm) | 550/500 | 550/500 | 800/650 | DIN 53363 |
Adhesion(N/5cm) | 120 | DlN 55357 | ||
Applicable Temperature °C | (-30~+70°C) | |||
Light Fastness | >6 | DIN 54004 |
Features:
High tensile strength (The widest span can reach 150m without the roof and pillars)
High tearing strength (Resist against 12 grade typhoon)
1. Lower construction and management cost than other building types.
2. Easy installation and Good connection (Short installation period, Easy to connect with other buildings or move as the whole set in any situation and different terrains)
3. Safe, Environment friendly,Good thermal insulation and sound insulation performance
4. Water-proof, anti-leakage and Anti-UV
5. Good weather resistance
6. Strong Self-clean
7.Durable for 10 years under normal usage
Application:
Factory Information:
We are the TOP specialisted manufacturer of pvc coated fabric in China, with the most advanced pvc coating line imported from Italy.
Hight Quality, Competitive Price, Good bulk leadtime and Service!
-----------T/T and L/C is acceptable.
---------- MOQ is 1500 Square Meters,but it could be adjusted for the clients.
--------- Standard roll length is 30m or 50m,and the width is including 250cm,295cm,300cm,320cm.
--------- Yes, sample is free,but the freight cost would have to be paid by yourself.
--------- Usually take 15-20days.This depends on the size and complexity of the order.
Please let us know the quantity and codes of the items so that we can advise a production schedule.