PVC marble wall panel production line/pvc faux marble sheet making machine
USD $65,000 - $120,000 /Set
Min.Order:1 Set
Qingdao Deerma Plastic Machinery Co., Ltd.
PVC marble wall panel production line/pvc faux marble sheet making machine
Temperature meter | Omron |
Contactor | SIEMENS/Schneider |
Relay | SIEMENS/Schneider |
Transducer | ABB/DELTA |
Power light, button | SIEMENS/Schneider |
Inverter | SIEMENS/ABB/DELTA |
Main Motor | SIEMENS |
PLC Control | SIEMENS |
Main Compision
A | SJSZ80/156 Conical twin screw extruder | one set |
B | Mould | one set |
C | Three-roller calender& Film laminating | one set |
D | Cooling bracket | one set |
E | The hauling machine | one set |
F | The cutting machine | one set |
G | Stacker | one set |
| Auxiliary Machines for your choose |
|
H | SHRL300/600 MIXER | one set |
I | SWP-360 Crusher | one set |
J | UV Coating Line (surface treatment) | one set |
No | Item | Technical |
1 | Extruder | SJSZ80/156 |
2 | thickness | 2-5mm |
3 | size | 2.44*1.22m |
4 | weight | 20-25kg/piece |
5 | output | 1200-1350 square meter/24h ;350kg/h-450kg/h |
Machcines's Pictures
Usage
PVC imitation marble sheet is 100% water proof, rigid-surfaced, nonflammable and nontoxic new material, which is widely used for interior decoration in hotel, resort facility,casino and offices.
Certification | Certified By | Certificate No. | Business Scope Expiry Dat | Expiry Date |
ISO 9001:2008 | Beijing Hangxie Certification |
| Design and Production of | 17/Sep./2013 |
CE | European | CN.CE.0680-10/10 | Plastic Extrusion Machinery & | 29/Oct./2010 |
TUV | TÜV Rheinland | 7467484_P+T | Production & Trade Assessment | 15/Jan./2014 14/Jan./2015 |
Main Product Lines Verification Report | TÜV Rheinland | 7467487_P+T | Main Product Lines Verification | 15/Jan./2014 14/Jan./2015 |
SGS | SGS-CSTC Standards Technical Services Co.,Ltd Focus Technology Co., Ltd | QIP-ASR155278 | Extrusion Machine, Pipe Machine ,profile Machine, Roof Machine… | 15/May./2015 |
DEERMA - Trade AssuranceLimit : US $170,000
1.100% Product quality protection
If the product quality does not meet the standards set in your contract, will refund the covered amount of your payment.
2.100% On-time shipment protection
If your products are not shipped on time as per your contract, will refund the cover amount of your payment.
3.100& Payment protection
If the supplier breaks the on-time shipment or product quality terms of your contract, will refund the covered amount of your payment
1. Quality Control Management
Q: Is there quality control on all production lines?
A: Yes, all production lines have adequate quality control
Q: Do the QA/QC inspectors work independently from the production line?
A: Yes
Q:How many QA/QC inspectors in total?
A: 4
Q: Number. of Employees in Each Production Line
A: Supervisor 1 ; No. of Operators 29 ;No. of In-line QC/QA 2
2.Supplier Management
Q:Does the company have a supplier assessment procedure?
A:Yes
Q:Does the company have an updated list of approved suppliers?
A:Yes
Q:Does the company establish and implement a standard procedure for purchasing contract review and approval?
A:Yes, with written standard procedures
Q:Does the company keep its supplier assessment reports?
A:Yes, with written standard procedures
Q:Does the company keep its supplier assessment reports?
A:Yes, assessment reports are available for the last 1-3 years
Q:Are the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements?
A:Yes, the purchasing document includes all the information required
Q:Is there a procedure to conduct random product inspections after final packaging?
A:Yes, with clear standard and written inspection records
Now we have machines in stock,sincerely invite you to vist our factory! Also you can contact me for machine's running video.