2015 alibaba made in china Folder Gluer Machine / Carton fold gluer
USD $6,000 - $8,000 /Set
Min.Order:1 Set
Cangzhou Kingsun Imp.& Exp. Co., Ltd.
2015 alibaba made in china Folder Gluer Machine / Carton fold gluer
The Technical parameter:2015 alibaba made in china Folder Gluer Machine / Carton fold gluer
Model | KS-AFG1500 | KS-AFG1800 |
Voltage | according customer need | according customer need |
Power | 3.2 kw | 3.2 kw |
Hz | 50/60 hz | 50/60 hz |
Weight | 1.0 tons | 1.3 tons |
Overall size | 2200x1900x1300mm | 2200x1900x1300mm |
Max size of box | 1500x1100mm | 1800x1100mm |
Min size of box | 200x260mm | 200x260mm |
2015 alibaba made in china Folder Gluer Machine / Carton fold gluer)
2015 alibaba made in china Folder Gluer Machine / Carton fold gluer
1.Q.Your comapny belong to the trading comapny or manufacturer?
A.Our company belong to the manufacturer,but our company have the qualification of export.
2.Q.Your comapny if have the ability of OEM?
A. Yes,our company can OEM.
3.Q.Where is your factory located in?
A. Our factory located in DONGGUANG COUNTY,CANGZHOU CITY,HEBEI PROVINCE,CHINA
4. Q.Which airport are near to your factory?
A.The airport have BEIJIANG,TIANJIN,JINAN,if take the bus from beijing to dongguang,it about need 3 hours.
5.Q.Which high speed rail station are nearest to your factory?
A. It is CANGZHOU STATION,From the beijing to cangzhou by high speed train,it about need 1 hour.
6.Q.How about the trading process of your company?
A. With customer talk about the requirement-Confrom the machine model with customer-Sign the sales contract-The buyer payment the deposite-The supplier arrange the production of machine-About need 30 days finished the production of machine-The buyer check the machine-The buyer payment the balance-The supplier arrange the shippment.
7.Q.How to control the machine quality?
A. 1) Our company always pay attention to the machine quality,From the production to shippment,we are very strictly.
2) The raw materials are environmental protection,non-pollution.
3) We have the prodessional technicist in charge for and supervision the production.
4) Our company have the professional department of technology to checkout the every link of the machine production.
8.Q.Your company if can arrange the technicist to foreign factory set up the machine and debugging?
A.Our company can arrange the technicist to foreign factory set up the machine and debugging,but the customerneed to charge for the cost of air ticket and room and board,besides it also need to charge for the technicist 80USD/DAY during the time in customer factory.