Cold Roll Forming Roof Steel Pipe Making Machine
USD $28,000 - $48,000 /Set
Min.Order:1 Set
Cangzhou Huachen Roll Forming Machinery Co., Ltd.
Huachen Roll Forming Machine Feature:
ISO/CE certification | |
Exported to more than 70 countries | |
Roll forming machine is suitable for various kinds of steel plate | |
We have mature foreign trade team and professional design team | |
We offer 1 year warranty and lifelong technical support for free |
Roof Steel Pipe Making Machine Reference Picture:
When roll forming machine finished,we take pictures and keep the finished sheets to our showroom.We test our machine strictly to make sure every customer get it satisfied. Your profile drawing is welcomed and acceptable. We can also design the roll forming machine as your requirement.
Roof Steel Pipe Making Machine Technical Parameter:
No. | Roof Steel Pipe Making Machine | |
1 | Suitable material | Color steel sheet ,galvanized steel sheet, aluminium sheet |
2 | Width of material | 333mm or customized |
6 | Thickness of material | 0.3-0.6mm, customized |
2 | Working speed | 8-10m/min, can be 20m/min |
3 | Main motor power | 4kw with cycloidal reducer |
4 | Hydraulic station power | 4kw |
5 | Electrical control system | PLC control system |
7 | Shaft diameter | 70mm |
8 | Roller station | 17 rows |
10 | Dimension | 8200x1500x1510mm |
11 | Weight | About 3.6 T |
12 | Voltage | 380V 3phase 50HZ or as the customer's requirements |
13 | Material of roller | High grade 45# forged steel plated with hard chrome plating |
14 | Material of cutting | Cr12 mould steel with quenched treatment |
15 | Working time | Can be 24 hours |
16 | Workers | 1-2 only |
Note:Above parameters are standard,we can design and make some change according to your requirement.
Roll Forming Machine Components (Free parts)
Roof Steel Pipe Making Machine Working Flow:
Decoiling→Feeding & Guiding→Roll Forming→Cutting→Finished Products To Support Table
Optional Device (Paid)
Packaging &Shipping
1.Main Roof Steel Pipe Making Machine and un-coiler is maked (If you need, we can also packed it with water-proof plastic)
2. PLC control system and motor pump are packed with water proof paper,spare parts in carton box.
3.One set of machine needs a 40'container to shipping.
Payment Terms
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
Your payment terms are acceptable.
Delivery Time
Within 30-45 days after receiving deposit
ISO and CE certifications
Huachen Roll forming machinery is located at Industrial Zone,Botou , Hebei Province of China. Welcome to visit us by:
From Bejing or Tianjin: High speed train to Cangzhou Xi, about 1 hour .
From Shanghai or Wuxi or Hangzhou: High speed train from Shanghai Hongqiao to Cangzhou Xi, about 4.5 hour.
Any question please see my contact below, you will get answer within 12 hours.