Stone coated metal roof tile forming machine line
USD $25,000 - $49,000 /Set
Min.Order:1 Set
Cangzhou Huachen Roll Forming Machinery Co., Ltd.
Galvanized stone coated metal roof tile machine production line
CE Certification Galvanized Steel IBR Profile Roof Forming Machine Price
CE Certificated IBR Profile Double Steel Roof Making Machine Made By Huachen
3 Phase 50hz Corrugated metal profile roof Sheet Making Machine
Automatic high performance corrugated roof sheet making machine Supplier's Choice
Stone coated metal roof tile forming machine line
Application
Stone coated sheet is formed by 0.4mm Al-Zn plating panel and color stones
It is modern,environmental and nice appearance.
We developed this stone coated production line based on long time running and improvement It is high-performance,stable, energy-efficient and easy operation.
Stone coated metal roof tile forming machine line Forming part
Leveling-Slitting-Cutting Machine
NO | Main Parameter of Leveling-Slitting-Cutting Machine | |
1 | Slitting Strips | 2-5 adjustable |
2 | Feeding material | 1000-1250mm |
3 | Main motor | 3KW |
4 | Cutting | PLC control the length and quantity |
Working Process: Uncoil-Feeding-Leveling-Slitting-Cutting |
Hydraulic Moulding Machine
Shearing Machine Forming Mould
1.Pressure 315T
2.Normal working pressure: 25MPA
3.Max distance from block to working table: 600MM
4.Stock distance: 600MM
5.Working table size: 1800x1200MM
6.Down motion max speed: 120
7.Back motion max speed: 88
8.Working speed: 17
9.Motor: 22KW
Finished Tile Sample
Stone coated metal roof tile machine Sand Blast Part
Automatic Bottom Glue Spraying Equipment
1.Closed automatic spraying glue system |
2.Outside Dimension:4000*1350*850mm(L*W*H) |
3.Structure:Channel steel ,welded |
4.Conveying device:Reciprocating chain conveys |
5.Adsorption of dust removal equipment:1 set |
6.Air compressor: 1 set, 7.5kw, air output is 1m³/min |
7.D46 high-pressure airless spraying system 1 set (German technology) |
8.Automatic high-pressure airless spraying gun: 1 set (Japanese technology) |
9.High-pressure airless manual spraying gun:1 set(Japanese technology) |
10.Standard 15M German import high-pressure airless feed tube and it can support the maximum pressure is 20Mpa |
100L stainless charging basket 1 piece |
Automatic Sandblasting Room
1.Outside Dimension :3000*1850*700mm(L*W*H) |
2.Structure:Channel steel ,angle steel ,welded |
3.Transmission:With glue spraying equipment compound chain transmit |
4.Conveying device:Compound chain transmit |
5.Air compressor: 1 set, 18.5kw, air output is 3m³/min |
6.High-pressure sand suction system: 1 set, sand suction is 1T/hour |
7.Sand hopper: 1 set, dimension:550*600*500 |
8.Automatic shaking sand system: one cylinder, the motor with 0.75kw, control: PLC |
First Drying Room
1.Outside Dimension:4000*1350*850mm(L*W*H) |
2.Structure:Channel steel ,welded |
3.Conveying device:Reciprocating chain conveys |
4.Adsorption of dust removal equipment:1 set |
5.Air compressor: 1 set, 7.5kw, air output is 1m³/min |
6.D46 high-pressure airless spraying system 1 set |
7.Automatic high-pressure airless spraying gun: 1 set |
8.High-pressure airless manual spraying gun:1 set |
9.Standard 15M German import high-pressure airless feed tube and it can support the maximum pressure is 20Mpa |
10.100L stainless charging basket 1 piece |
Automatic Surface Glue Spraying Equipment
1.Outside Dimension :30000*850*700mm(L*W*H) |
2.Structure:carbon steel welded |
3.Frame insulation wall: 30 meters’ long, 1mm carbon steel plate bending forming filled with cotton insulation |
4.Automatic temperature controller:2 sets,Range of adjustable temperature:0-160° |
5.Infrared fluorescent tube:50 pieces |
6.Conveying device: Reciprocating chain conveys 30m |
7.Cooling device:1 set |
8.Total equipment matches total control station 2 sets (Control system) |
9.Productivity:3-6m/min Calculate as 1.2m per piece,eight hours,produce 1500pcs every day |
10.Whole machine power:130kw |
Packaging &Shipping
1.Main Stone coated metal roof tile forming machine line and un-coiler is maked (If you need, we can also packed it with water-proof plastic)
2. PLC control system and motor pump are packed with water proof paper,spare parts in carton box.
3.One set of machine needs a 40'container to shipping.
Payment Terms
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
Your payment terms are acceptable.
Delivery Time
Within 30-45 days after receiving deposit
ISO and CE certifications
Huachen Roll forming machinery is located at Industrial Zone,Botou , Hebei Province of China. Welcome to visit us by:
From Bejing or Tianjin: High speed train to Cangzhou Xi, about 1 hour .
From Shanghai or Wuxi or Hangzhou: High speed train from Shanghai Hongqiao to Cangzhou Xi, about 4.5 hour.
Any question please see my contact below, you will get answer within 12 hours.