Heavy Lifting Gantry Crane for Material Handling
USD $100000.00 - $100000.00 /Unit
Min.Order:1 Unit
Xinxiang Zhongyuan Hoisting Machinery Head Factory Co., Ltd.
Heavy lifting Gantry Crane
1. gantry crane is widely used in open warehouses, material stocks area, cement plant, granite industry, construction industry, engineering industry, railway station to lifting and loading unloading goods. It also can be used together with other lifting appliance for special purpose. The lifting capacity is 5-100tons; Span is of 18-30meters.
2. Working temperature: -25-40 ° C
3. Working duty: A5- A6.4. Power source: 380V 50Hz 3Phase. And we can design as your demands.
Keep commitments; Pay attention
to Credit.
Provide long-term parts and repair services all life.
service and Turn-key project..
Factory door
30 workshops for different part jobs
Our server Team
Packing Details : Packing, solid bicycle saddle, 50pcs/carton
Delivery Details : 3-30 days after order of Solid bicycle tire tubes
1, Including single girder bridge crane and double beam bridge crane
2. The main girder of single girder bridge crane bridge is used more h type steel or steel section and steel plate combination. Lifting trolley is often chain hoist, electric hoist, or used as lifting mechanism parts assembled.
3.Electric single-beam bridge crane working speed, high productivity, the manual, the weight is bigger as well.
1.Bridge crane is widely used in indoor and outdoor warehouses, factories, docks and outdoor storage yard, etc. Bridge crane can be divided into general bridge crane, simple beam bridge crane and metallurgical special bridge crane 3 kinds.
2.Bridge crane is a bridge in high orbit a bridge type crane, also known as the crown. Bridge crane bridge along the laid on on both sides of the elevated rail longitudinal operation, lifting trolley along the bridge is laid on the orbits of the horizontal run, constitute a rectangular scope of work, can make full use of bridge the space below the lifting materials, from the ground equipment obstacles.
1. Including gantry crane , Semi-portal crane ,double cantilever gantry crane, single cantilever gantry crane.
2. Single cantilever girder gantry crane structure is simple, convenient installation, its quality is small, box girder are partial rail frame structure. Compared with the double girder gantry crane, less overall stiffness.
A: We are factory.
A: Generally it is 20-30 days . It is according to quantity and size.
A: Please tell us the crane's Span, working condition , temperature, Load capacity , Lifting height, meterial and so on. The more detailed the better.
A: 30% T/T in advance ,balance before shippment or L/C at sight.