Floating Dock Platform Marina Floating Pontoon
USD $250 - $500 /Square Meter
Min.Order:1 Square Meter
Guangzhou Stark Yacht Marina Engineering Co., Ltd.
Galvanized Steel Floating Dock Information | |
Weight: | 45kg/square meter |
Load: | 50-300kg/square meter |
Freeboard: | 350-750 mm |
Lifespan: | 30 years (should be maintined regularly) |
Environmental: | Recyclable, protect environmental requirements |
Frame: | Galvanized Steel |
Floats: | HDPE floats / concrete floats |
Decking: | Antisepsis pine wood / WPC / Hardwood |
Floating Dock Technical parameter | |||
SPECIFICATION(MM) | FREEBOARD(MM) | CAPACITY(N/M) | WARRANTY |
2000*12000 | 500-550 | 1200N-1800N | 10 YEARS |
2500*12000 | 500-550 | 1500N-2500N | 10 YEARS |
3000*12000 | 500-650 | 1500N-2500N | 10 YEARS |
2500*12000 | 500-650 | 1500N-2500N | 10 YEARS |
4000*12000 | 500-650 | 1500N-2500N | 10 YEARS |
Stark yacht marine accessories information
1.Structure: Galvanized Steel Frame
2.Decking:WPC,polo wood,pine wood, or other hard woods for your option. Different is avilibale
3.Floats:LLDPE Floats,Concrete floats
4.Fix:piling
5.Pile Cap:LLDPE Pile Cap
6.Power Pedestal: alluminum alloy,stainless steel,polyethylene
7.Dock Bumper:WPC bumper,rubber bumper
8.Cleat:stainless steel 316 or 316L,5 tons,10 tons
There are 4 steps to install a aluminum alloy floating dock.
Step 1. Installation in factory, assembling and taking detailed pictures & video guidance.
Step 2. Loading components, depends on the quantity to load before assembled or after assembled.
Step 3. Installation will be proceeded by the local construction teams.
Step 4. Construction teams follow the guidance we sent to install, or we send our engineer to guide the teams.