carbide tube pipe,carbide coated tube,carbide pipe and tube

carbide tube pipe,carbide coated tube,carbide pipe and tube

USD $35.00 - $35.00 /Kilogram

Min.Order:1 Kilogram

Supply Ability:
18 Ton / Tons per Month
Port:
Guangzhou Shenzhen Hongkong Shanghai Ningbo etc
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Place of Origin:
Hunan, China
Brand Name:
JINDING
Model Number:
JDMM38
Type:
Power Tool Parts

Zhuzhou Jinding Cemented Carbide Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhuzhou Hunan China
Main Products: Tungsten Carbide

Product Details

>> Product Details

Namecarbide tube pipe,carbide coated tube,carbide pipe and tube
Main Market
North America, South America, Europe, Mid East, Africa
Application Field

Tungsten carbide sleeves are often used in water pump, oil pump and other pumps, especially used for high pressure or corrosion resistance pumps, flow restrictors, servo seat.

Material      tungsten carbide
Grade   

YG6, YG6X, YG6A, YG12, YG15, YG20, YG25

Design&Size 
OEM or ODM
Properties
High hardness and strength, excellent wear resistance
Finish 
Sintered, sandblasting or polish
PackingOur standard packing (paper + carton box or inner box + outer box) or as request 
Lead timeSample date: 5-7 days, mass date: 15-35 days
ShippmentBy express( such as DHL, FeDex, TNT, UPS), by air or by sea
Service      We will follow up goods for our customers and help them to solve problems after sales.

 

 

 

>> Company Introuduction 

1. We are manufacturer for making all kinds of carbide cold heading dies; carbide wire dawing dies; carbide rods; carbide strips; carbide plates; carbide inserts; carbide roller; carbide button; carbide teeth; carbide drilling tips; carbide ball; carbide tips; carbide pins; carbide cutter;carbide die blank; carbide mould blank; carbide dies; carbide oilfield drill bits; carbide rings; carbide shear knife; carbide blades; carbide rolling mill, ect.

2.  Our best selling products: carbide tube pipe,carbide coated tube,carbide pipe and tube.

3. 12 years manufacturing experience + professional sales team. 

4. High quality, competitive price.

5. Samples can be provided for very short time.

6. Mass production time is about 15-35 days depends on final exact quantity.

7. Mass processing according to customer’s final drawing or customer 

    approved samples.

8. Best after-serice for a very long time.

  

 

>>Factory Pictures

carbide tube pipe,carbide coated tube,carbide pipe and tube

 

 

>> Similar Products

 

carbide tube pipe,carbide coated tube,carbide pipe and tube

carbide tube pipe,carbide coated tube,carbide pipe and tubecarbide tube pipe,carbide coated tube,carbide pipe and tube

 

>>Grades and properties

 

carbide tube pipe,carbide coated tube,carbide pipe and tube

Grade

Binder (Wt%)

Density (g/cm3)

Hardness (HRA)

TRS (≥N/mm²)

YG6

            6

            14.8

            90.0

          1520

YG6X

            6

            14.9

            91.0

          1450

YG6A

            6

            14.9

            92.0

          1540

YG8

            8

            14.7

            89.5

          1750

YG12

           12

            14.2

            88.0

          1810

YG15

           15

            14.0

            87.0

          2050

YG20

           20

            13.5

            85.5

          2450

YG25

           25

            12.1

            84.0

          2550

 

 

 

 

>> Production Process

raw material proportioning => blending and wet milling => dry and sieving => mixture quality test => rubber adding and granulating =>

pressing => shaping => quality check and drying => sintering => surface treatment => final inspection => qualified product

 

 

>> Main Productscarbide tube pipe,carbide coated tube,carbide pipe and tube

 

 

 

>>Company Certificate

carbide tube pipe,carbide coated tube,carbide pipe and tube

 

 

>> How to get order?

A: Selected perfect types,tell us the item number and confirmed price each 

other.

B: Confirmed sample quality,sample lead time is 5-7 days.

C: Send PI (30% deposit, balance before shipment).

D: Confirm bulk order time 15-35 days, according to the final quantity.

E: Production arranged and progressing tracking, take photos for customer.

F: Email, Trademanager, Skype or call contact will be more effectively.

G: Checking quality and ready to shipment.

H:  After service for a very long time.

 

 

>>Contact Information 

carbide tube pipe,carbide coated tube,carbide pipe and tube

Contact Supplier

Ms. Fiona Huang manager Chat Now
Telephone
86-731-22660738
Mobile
15115377740
Fax
86-731-22663098
Address
No. B-7, Zhuzhou Auto Parts Industrial Park, No. 9th, Zhongda Road, Tianyuan District, Zhuzhou City Zhuzhou,Hunan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Tools > Tool Parts
Categories
Hi~