WPC Decking Mould WPC Moulding for Paving

WPC Decking Mould WPC Moulding for Paving

USD $500 - $15,000 /Set

Min.Order:1 Set

Supply Ability:
40 Set / Sets per Month
Port:
shanghai wuhan ningbo
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Place of Origin:
Hubei, China
Brand Name:
Jinghua
Model Number:
JH006
Shaping Mode:
Plastic Extrusion Mould
Product Material:
Steel
Product:
Other, WPC Moulding

Huangshi Jinghua Plastic Mould Co., Ltd.

Business Type: Manufacturer
Huangshi Hubei China
Main Products: WPC Extrusion Mould ,Wood Plastic Extrusion Mould ,PVC Extrusion Mould ,PE Extrusion Mould ,PP Extrusion Mould

Product Details

Specifications

WPC Moulding
1.Rich Experience
2.Stable discharge, high speed & easy operation
3.Material: 3Cr17, 3Cr

WPC Moulding

 

Name

WPC Decking Mould WPC Moulding for Paving 

Size

Various sizes as per customer require

Mould material

3Cr17, 3Cr17MoNiV, DIN1.2316 or as per your request

Mould cavity

One or multi-cavity

Mould composition

Die head, aluminum heating panels, calibrators and water tank

Feature

High polished surface, stable discharging, soft-hard, surface layer, cladding

Test

Mould will be tested to get the satisfy sample before delivery

Sample

Sample will be arranged by express for customer approval

Service

Provide complete set of formulation, technology and perfect after sale service

Lead time

30-35days

Package & deliver

Poly wood case for exporting, each mould will be cleaned before packing.

Quality assurance

ISO9001:2008

 

Our extrusion mould advantages:

1.we are founded in 2001, extend 13 years professional experennce gives us dominate position in extrusion moluld industry., quality and precision are the most import target of our company.our products enjoy an excellent reputation in plastic extrusion mould industry.

 

2.We owned a team of mature and experienced technicians,rich experiences skill workers from design, manufacture and debugging.

 

3.We can make all kinds of moulds according to customer requirement.The mould can be post-co extrusion, color co extrusion, embossing co extrusion, surface layer and so on.

 

4.Provide complete set of production process and technology transfer service

 

5. Flow channel systematic design is based on theoretical calculation, practical conclusion, adopting reasonable compressing ratio and stain technology WPC Decking Mould WPC Moulding for Paving

 Mould composition

 

The moulds we made:

 

 WPC Decking Mould WPC Moulding for PavingWPC Decking Mould WPC Moulding for PavingWPC Decking Mould WPC Moulding for PavingWPC Decking Mould WPC Moulding for Paving

 

 

WPC Decking Mould WPC Moulding for PavingWPC Decking Mould WPC Moulding for Paving

Fine quality after-sale service:

1.We can provide a whole set of technical support including extruder election, formula process and extrusion mould.

 

2.we have excellent test mold technicians

 

3.All the moulds must be inspected and tested to reach 100% qualified before delivery.

WPC Decking Mould WPC Moulding for Paving

Manufacture process

  

Common finished product flaws solution

 

Product defects

Possible reasons

Handling methods

Extrusion mould distortion

Too short cooling time, not enough cooling for finished products

delay the cooling time

Too rapid speed for extrusion, forced pull to lead the distortion

Slow down the speed of extrusion die

Finished product structure with defects

Modify the dies

Too high temperature for die, poor cooling for finished products

reduce the mould temperature

Knit line

Insufficient injection pressure, too slow injection speed, too small gate and flowing pipe

Increase the injection pressure and injection speed, modify the gate and flowing pipe.

Too low forming temperature and mould temperature

Increase temperature, increase back pressure or accelerate the rotating speed of screw

Insufficient exhaust in interflow zone and no run-off pit

Fix exhausting holes in interflow zone and increase the number of run-off pits.

Use too much release agent

Reduce to use release agent

Poor luster of finished products

Too slow injection speed, insufficient pressure and low mould temperature

Increase the injection speed, injection pressure and mould temperature

Hydrosphere or grease pollution in the mould cavity

Clean it up

Poor grinding of mould surface or too small gate and flowing pipe

Modify mould

Insufficient injection quantity or water contained in the raw material

Increase the injection pressure and injection speed, delay the jetti

Cracks of extrusion mould of finished products

Too low temperature of material or mould

Increase the temperature

Insufficient stripping lean or improper extrusion way

Modify the mould

Too small gate

Modify the mould

Insufficient stripping angle

Modify the mould

Coarse surface of extruded finished products

Too low forming temperature

Increase the temperature, accelerate the rotating speed of screw

Too low mould temperature

Increase the mould temperature

Surface blocks of extruded finished products

Not clean material pipes, contain wastes

Clean up material pipe

The additive articles such as color master batch are not done according to the requirements

look for the corresponding color master batch

Insufficient extrusion quantity

Insufficient temperature for material pipe

Increase the temperature

Wastes in the gate or too low speed rate of screw

Clean up the gate or accelerate the rotating spped of screw

Extrusion mould expansion of extruded products

Too low temperature of mould head or too fast rotating speed of screw

Increase the mould head temperature and reduce the rotating speed of screw

 

 

Too fast limited material

Adjust the limited material device

Produce much gas when extruding

Too high melting temperature

Reduce the melting temperature

Wastes in the material pipe

Clean up the material pipe

Pits of extruded products

Water contained in the raw material

Dry the material

Too high meting temperature, too fast rotating speed of screw

Reduce the meting temperature, and the rotating speed of screw

Steps of making Mould

1.drawings or samples provided

Get the drawings or samples from our customers

2.Research & Development

The quality, mold life,  arrangement, price, material, delivery time, payment term, etc.

3.Place an order with first payment

Receive the purchasing order and the first payment bank receipt from your side

4.Mould design Confirmation

Design the mold for you as per your drawings

5.Mould making

According customer's specifications to build the mould. Before making the mould, we'll send mould design for customer's approval

6.Sample making

Do the mold test and send the samples for approval till you confirm it

7.The delivery time of mold or products

7-25 days

8. Delivery 

To deliver goods by sea or by air, according to customers' requirements.   

9. Balance Payment

 T/T

 

About our company:

 

WPC Decking Mould WPC Moulding for Paving

 

WPC Decking Mould WPC Moulding for Paving

Our certificate:

WPC Decking Mould WPC Moulding for Paving

 

Website: www.jinghuamould.en.china.cn 

 

Add: Machinery Industrial Park, Huangjinshan New Area ,Huangshi,Hubei,China mainland

 

Wuhan tianhe airport:90 Minutes by car

 

If you are interested in our moulds, please feel free to contact with us and show us your sample picture or drawings.We will do our best to provide you with competitive price and professional service!

 

Contact Supplier

Ms. Cindy Shen Foreign Manager Chat Now
Telephone
86-714-6399869
Mobile
86-15871173302
Fax
86-714-6393980
Address
Machinery industrial park,Huangjinsan New area Huangshi,Hubei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Mechanical Parts & Fabrication Services > Moulds
Categories
Hi~