bags wine sealing packaging machine/ liquild bags packaging machine
USD $1,750 - $2,350 /Piece
Min.Order:12 Pieces
Description and features
SF-1000liquid packing machine is widely used for various kinds of liquid packaging.Such as,milk,soybean milk,fruit
juice,beverage,ice drink,soy sauce,vinegar and wine,It uses single lay film PE as packaging materials.It can automatically
sterilized by ultraviolet radiation,bag molding,print the code,precisely fill,seal and cut at one time.This series has been long-tested
and its performance enjoys a high reputation from our clients,meanwhile, this series is easy to operate and run smoothly with low
failure rate.
Automatically finish the processes of pouch forming, filling, sealing, cutting, date printing for pillow pouch packaging.
Two types suit for single layer PE film and laminated films.
PLC controller and A Pattern calibration photoelectric controller device, ensure the patterns will be complete and beautiful.
Quantitative piston pump filling ensure packaging
Model: SF-1000
Production capacity:1500-2200B/H
Filling Range:100-1000ml
Power: 220V-380V/50HZ-60HZ
Overall dimension: 780(L)×1000(W)×1850(H)MM
Weight: 450KG Delivery time: 7 working days after the receipt of deposit from buyer
Voltage and frequency: 380V/50Hz, 3phase, 4 wires
Payment: 30% of total value will be paid by T/T as deposit, 70% balance will be paid by T/T
before shipment.
Spare part: one year of spare parts Guarantee time: one year
after shipment Valid Time of the quotation: 1 months
Installation: Before shipment, machines will be tested by our technicians to make sure they can work well. Our technicians will be sent to user’s
factory to install the machines and train workers. The buyer will pay for our technicians’ return tickets, meals, accommodation and other expenses.
The buyer will pay USD 60 for each technician per day. After-sale service
We will send our technicians to install machines and train workers.
During production, if any problem appears, please contact us in time, our technicians will help you solve the problem immediately.
We will send emails in certain time to ask the work status of our machines. If any part on machine is needed, we will send the part by express as
soon as possible.
Installation explanation
We will offer the list of devices which will be necessary for installation two weeks before our technicians go to the buyer’s factory for installation.
The buyer will inform us of the exact date of installation so that we can send our technician in time without delay.
If there are the mistakes caused by us, which makes production delay, such as failing to
send some part, some parts are broken.