made in china small rubber tube (PI-07 )
USD $500 - $650 /Ton
Min.Order:1 Ton
Foshan Broad Ocean Hardware Co., Ltd.
made in china small rubber tube (PI-07 )
1. Product description of slot tube rubber
slot tube rubber
1).SS304/SS316
2).Finish:Satin/Mirror
3).1200/1300mm/1500mm
4).Corner post/joiner post/end p
slot post balustrade used for balustrade handrail
Diameter:38.1mm,48.3mm and 50.8mm
Thickness:1.2mm/1.5mm/2.0mm
Fittings:end cap & base plate & cover plate
Types:corner post/joiner post/end post/gate post/hinge post
Product Name | slot tube rubber |
Material | SS304/316 |
Finish | Satin/Mirror polish |
Thickness | 1mm,1.2mm,1.5mm,2mm |
Length | 1000-6000mm |
Features | Double slot,single slot |
Usage | Glass Pool Fencing & Balustrading |
Packing | Bubble Wrap inside,Steel Pallet outside |
OEM | Offered |
MOQ | 50pcs |
Delivery Time | 15 days |
2.Q&A
Q1.Where is your factory? small rubber tube
We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.
Q2.What material do you have? small rubber tube
SS304/SS201/SS316
Q3.Can you provide sample for us? small rubber tube
Yes, free sample is available
Q4. How do you ensure quality control? small rubber tube
We ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.
Q5.How do you ship the goods to us?
We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.
Q6.Which country is your main market now?
Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.
Q7. Can you do the full set of handrails for us?
Yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.
Q8. How about your delivery time ?
15-20 days for Pipe. 25-30 days for handrail fittings .
Q9.how about your payment terms?
T/T,L/C,D/P.