handrail pipe stainless steel base/steel flange stainless steel base FR-07
USD $1 - $5 /Piece
Min.Order:100 Pieces
Foshan Broad Ocean Hardware Co., Ltd.
steel flange stainless steel base FR-07
1.Size of steel flange stainless steel base FR-07
FR-07 | Item NO. | Φ | ||
FR-07-381 | 38.1 | |||
FR-07-508 | 50.8 |
2.Details of steel flange stainless steel base FR-07
Material of steel flange stainless steel base | AISI 201/304/316 |
Surface of steel flange stainless steel base | Polished/Satin |
Certification | ISO 9001 |
Suitable tube size | Ø38.1/50.8mm |
MOQ | 100 PCS |
Sample Lead Time | 3-15 DAYS |
Delivery Time | 25-40 DAYS |
Delivery Method | by sea,by air or by express |
Payment Terms | 30% deposit,and the balance before shipping T/T,L/C,Western Union |
OEM | Accepted |
Packing method | Each pc with one polybag,then into one carton,or as your request |
Production Machinery:
Machine Name | Brand & Model No. | Quantity | Number of Year(s) Used | Condition |
---|---|---|---|---|
Polishing Machine | No Information | 32 | 4.0 | Acceptable |
Hydraulic Press | 10T | 3 | 4.0 | Acceptable |
Punching Machine | No Information | 1 | 6.0 | Acceptable |
Sawing Machine | SHENDIAO & GZ4232 | 1 | 1.5 | Acceptable |
Manual Lathe | Cd6132 | 1 | 6.0 | Acceptable |
CNC Lathe | E-CA6140, 6140A1750 | 3 | 6.0 | Acceptable |
Milling Machine | X3112 | 1 | 6.0 | Acceptable |
Drilling Machine | SWJ-16, S4020, SWJ-14 | 6 | 6.0 | Acceptable |
steel flange stainless steel base FR-07
Our staff of sales and technical support is available to help you in selecting the right protection for your application as well as to provide you with samples of our products for evaluation. At Eonsly, we are committed to providing the highest level of customer service,competitive pricing, speedy delivery and a comprehensive, cuttingedge product offering. Our ultimate goal is your satisfaction. steel flange stainless steel base FR-07
Best Price Policy.
We aim to always provide the best price available on every product we supply. We continually work closely with our manufacturers and keep our overheads low so that we can consistently offer you the best available prices. We are confident thatour prices are unmatched, but if you find that this is not the case we will be more than happy to better our price.
Quality Assurance and Standards. steel flange stainless steel base FR-07
We recognise customer satisfaction is of primary importance to our success. We are mindful of our responsibility to our customers we serve directly and the customers who resell our products ,we will strive to understand your requirements andconcerns and to merit your business by responding effectively to your needs.
Advantage.
Optimal production methods & perfect logistical performance highly-automated production& strictly-controlled quality supervision. steel flange stainless steel base FR-07
steel flange stainless steel base FR-07
Q1.Where is your factory?
We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.
Q2.What material do you have? steel flange
SS304/SS201/SS316.
Q3.Can you provide sample for us?
Yes, free sample is available.
Q4. How do you ensure quality control?
We ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.
Q5.How do you ship the goods to us?
We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.
Q6.Which country is your main market now?
Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.
Q7. Can you do the full set of handrails for us?
Yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.
Q8. How about your delivery time?
15-20 days for Pipe. 25-30 days for handrail fittings. steel flange
Q9.how about your payment terms?
T/T,L/C,D/P.