Specifications
Heating Cable with Thermostat1.Digital programmable thermostat
2.LCD display
3.Load: 16A
4.CE approved
Under Floor Heating Cable with Thermostat
Heating thermostat with LCD screen, which has manual mode and programmable mode.The thermostat is recommended for the control of electric heating deviceor on/off valve actuator in
hydronic underfloor heating.
This intelligent temperature controller applies to electric heating control(heating cable) or hot water heating system’selectrically operated valve.
Data--
1 - Character: LCD display, with backlight
2 - TC43PE: with internal and external sensor
3 - Voltage:230V (±10%)
4 - Electrical Current :<16A
5 - Output Format: relay contact
6 - Temperature controlling range: +5~50oC
7 - Temperature controlling precision: ±1oC
8 - The surface material: PC+ACS engineer plastic, Fire-resistant
9 - Environment Temperature :-5oC~+50oC
10 - The length of external sensor: 3m
Features--
1 - Integration,standard 86 type wall mounted directly.
2 - Tilt interface LCD,better read.
3 - Power off,completely cut off the power.
4 - Week cycle,six period one day, according to temperature program design.
5 - Sensor selection:Internal single sensor controller,External sensor controller.
6 - Child lock function.
7 - Temperature sensor failure alarm.
Photos--
self regulating heating cables have found worldwide applications in pipes, indoor and outdoor heating systems, farming, control panel and electricity systems providing the best heating, warming, freeze prevention and snow melting solutions, we have exported our goods to many countries.
Snow melting,outdoor road heating
Greenhouse soil heating and temperature process
Concrete drying
Installation Notes
1) Don't damage cable. The bend radius should be more than 6 times of thickness of cable.
2) Well installation can guarantee the efficiency. Use nylon cable ties to fix heat cables.
3) Add an aluminum tape between the pipe and the heat cables if the Pipe is non-metallic.
4) After the installation, take a full test and make sure the system works well.
5) Heat insulation materials should be dry and the joint of cable should be sealed.
6) Make a mark on the outer protective layer of the pipe.
7) The junction box should be sealed to prevent rainwater.
8) For explosion-proof products, the metal jacket should connected to the terminal.
9) Protective sleeve must not be damaged during installation, and the core wire can not bare.
Certification
Factory show
Delivery details
We will prepare shipping ASAP once we receive your money, and give you the tracking number after we send out your goods. Usually within 5-35 working days you can receive your item.
Method of Payment
Payment methods | Commission fee | Arriving days afer paying |
| No commission fee | 3-5 working days |
|
3.9%+0.3 usd |
Instant |
|
No commission fee |
Instant |
| No commission fee |
Instant |
|
Alibaba calculate it |
Instant |