1. Melting iron.steel 2kg-200kg/hr
2. Voltage:3P 380-480V
3. Durable, high quality
4. CE/ ISO certificate
5. IGBT, MONSFET
Main parameters of DDZP-160 |
| |
Input power | 160KVA |
Output current | 40~200A |
Output voltage | 70~550V |
Input power supply | Three phase 380V±20% 50 or 60HZ |
Output oscillating frequency | 1KHZ~20KHZ It is made based on customer's requirement of parts heat treatment. |
Duty cycle | 100%24 hours of continuous work |
Weight | 135KG |
Volume (cm) | 47*95*85 |
Cooling water desire | ≥0.3Mpa ≥25/Min |
Cooling water desire | ≥0.2Mpa ≥8/Min |
Power waterways | One water inlet, three water outlet |
Automatically panel with time PCB function, could custom 1-999sec |
Heating time | 0.1~99.9sec | Heating preservation time | 0.1~99.9sec |
Main features of MF melting furnace:
1, MF melting furnace can be used for the melting of steel, stainless steel, brass, aluminum, gold,silver and so on.
2, because of the stirring effect which caused by the magnetic force, the melting pool can be stirred during the melting course to ease the floating of the flux and oxides to produce high quality casting parts.
3, wide frequency range from 1KHZ to 20KHZ, working frequency can be designed by changing the coil and compensating capacitor according to the melting material, quantity, stirring effect desire, working noise, melting efficiency and other factors.
4, compared with SCR medium frequency furnace, it can save energy at least 20% and up.
5, small and light, a lot of modes can be selected to melt different amount of matals. Not only it is suitable for the factory, but also suitable for the colleage and researching companies to use.
6, 24hours non-stop melting ability.
7, it's easy to change melting furnace for different capacity,different material, different way of pouring out, to suitable for all kinds of requirements.
Main models and melting abilities:
The table below lists the main models and recommended maximum melting abilities. About 50 to 60 minutes are needed to finish one melting process at cool status of the furnace, at hot status of the furnace, only 20 to 30 minutes are needed.