mini pile driver
USD $20,000 - $25,000 /Set
Min.Order:1 Set
Wuxi Beiyi Excavator Parts Factory
Hydraulic Vibratory Pile Driver Hydraulic Pile Hammer
powerful and reliable motor
flexible operation
suit 20-50 ton excavator
Pile Driver Application
The efficient of vibration pile method is higher than other methods. It is mainly are fit for driving and extracting sheet piles, I-steel piles, Cement square pile,cylinder pile, larsen piles in various shapes. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines.
Performance parameter
Model | V-250D | V-300E | V-330E | V-350E | V-400D | V-450B | V-500A |
Vibration frequency(rpm) | 2800 | 3000 | 3000 | 3000 | 2600 | 2600 | 2600 |
Vibrating force(T) | 39.5 | 48 | 51 | 53.4 | 55.5 | 58 | 63 |
Hydraulic system operating pressure(Bar) | 300 | 300 | 300 | 300 | 300 | 300 | 300 |
Hydraulic system flow demand(Lpm) | 175 | 240 | 270 | 270 | 280 | 300 | 320 |
Main body weight(T) | 1.55 | 1.65 | 1.65 | 1.8 | 2 | 2.05 | 2.1 |
Apply to excavator weight(T) | 20-24 | 24-30 | 30-35 | 35-40 | 38-42 | 40-45 | 48< |
Clip mouth weight(kg) | C15:455kg; C16E:530kg; C18E:578kg C30B:455kg; C35B:530kg | ||||||
Assistant arm weight(kg) | A200:500kg; A250B:600kg A350:900kg |
The whole body includes
1. Vibratory hammer
2. Arm
3. Clamp
4. Handle and Control box, etc.
Pile Hammer How to Work?
Vibrating pile hammer is using its high frequency vibration to vibrate pile body with high acceleration to pass the vertical vibration of mechanical produce to pile which leading to changes in the soil structure around the pile, strength decrease. Soil around the piles become liquefaction to reduce frictional resistance between side of the pile and the soil. Then using the excavator down force, vibrating pile hammer and pile body weight to sink pile into the soil. When extracting piles, in the condition of vibration to pull out the pile by using excavator lift force. Excitation force needed by pile driving machinery are comprehensive determined by site soil, soil condition, moisture content and type of pile, construction.
Warranty
- six months warranty for the machine from the date of delivery;
three months for the wearing parts. (we will offer a full set of spare parts free of charge)
-oversea service is available
Welcome to visit our factory, If you have any questions, please feel free to contact me!