Mineral / Spring / Purified Drinking Water Bottling Line / Bottled Water Filling production Line

Mineral / Spring / Purified Drinking Water Bottling Line / Bottled Water Filling production Line

USD $4,000 - $5,000 /Set

Min.Order:1 Set

Supply Ability:
1000 Set / Sets per Month
Port:
shenzhen
Payment Terms:
T/T Credit Card

Quick Details View All >

Condition:
New
Application:
Beverage
Packaging Type:
Bottles, Barrel
Packaging Material:
Plastic
Automatic Grade:
Automatic
Driven Type:
Pneumatic

Shenzhen Chinotech Environmental & Energy Technology (CEET) Co., Ltd.

Business Type: Manufacturer
Shenzhen Guangdong China
Main Products: UV sterilizer ,Water Filter ,RO System ,MBR System ,Ozone

Product Details

Specifications

1) S.S304 frame with Clear windows
2) PLC control/CE ISO approval
3) Washing Filling Capping

Turnkey 5Gallon Water Bottling Line,the following unit can working seperately,also can be for whole bottling water factory from A to Z connect each by conveyor system,whatever you need build new bottling line or upgrade your old filling line,we can provide professional solutions.

a) Automatic decapping machine
b) Automatic outside brusher washing machine

c) Automatic inside brusher washing machine

d) Automatic bottle loader

e) Automatic Washing Filling Capping Machine

f) Automatic caps washing & loading machine

g) Automatic capsules shrinking tunnel 

 

5Gallon bottled water filling machine/ Monobloc water bottling machine

Model

XG-100/J(300BPH)

Power supply

220V 50Hz

380V 50Hz

Capacity

300BPH for 3Gallon to 6Gallon Bottle

Input power

6.4kw

Air pressure                              

0.7Mpa

Control System

PLC control ,Famous electronic components with CE approval, Luxury designed

Washing / Filling capacity

300BPH   ( with six washing postion)

Outsize (mm)

3350*980*1600

Packing size (mm)

3600*1230*1850

G.W. /N.W.

450/400KG

Features:
1) S.S304 Frame/ spraying nozzle/filling nozzle with transparent window for monitoring the each working process
2) Low pressure protection: when incoming air's pressure is <=0.5MPA, the equipment will be automatically stopped
3) Water-shortage protection: when the level of the water tank is lower than the liquid switch, the equipment will be automatically stopped
4) Low water level protection for finished water tank(water tank with filler's water supply): when the water level of the tank is lower than that of the liquid switch, the equipment will be automatically stopped
5) Special filling principle-dual filling(at the early filling stage, the two filling valves work simultaneously; after some time, the auxiliary filling valve stops working, while main filling valve keeps working) avoid water to be waste
6) Filling time adjusted between two levels:0.1S and 1S, ensuring the precision for filling amount.

 

Contact Supplier

Ms. Jenny Wu Manager Chat Now
Telephone
0086-775-86528611
Mobile
13823764690
Fax
0086-775-83654021
Address
Nanshan Shenzhen,Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Packaging Machine > Filling Machines
Categories
Hi~