Top Precision Fully Automatic Plastic Drinking Cup Machine
USD $110,000 - $150,000 /Set
Min.Order:1 Set
Weihai E-Fashion Import & Export Co., Ltd.
Top Precision Fully Automatic Plastic Drinking Cup Machine
Main Features:
1.This EPS foam cup making machine is using Expandable Polystyrene as raw material
2. Finished products: foam cups and bowls.
3. Main machines: boiler, mixer, pre-foaming machine, drying machine, shake boult, center filling device, forming machine
4. PLC control
Process:
Mixing ---pre-expanded---drying---filtering---storage--- forming-----collecting
Technical data for forming machine:
Forming Area | L1100 mm×W310mm(L*W) |
Forming Height | 3 ~ 180 mm |
Formming Speed | ≤7-16 s /mold |
Power Consumption | ≤0.3kw/day |
External Power Supply | 220 V |
Steam Pressure | 6~9 bar |
Steam Connection | 1 Inch |
Cool Water Pressure | 4~5 bar |
Cool Water Connection | 1 Inch |
Air Pressure | 6~9 bar |
Air Connection | 1Inch |
Our Products
Packing and Shipping
Our Service:
1.when we make the order, I will follow your order, update machine information and sen-d to you.
2.when finish the machine, we will pack the machine well and arrange ship send to youwhen the machine got your factory we will send our rich experience engineers to your c-ountry install machine and train your worker till you satisfied with them.
FAQ
Q:. Why I choose your company?
A: a, We are China Leading foam machine Manufacturer.
b ,Best Quality & Best Service with Competitive price.
c, 100% inspection Before Shipment. And we have got CE certificate
d, we have Professional technical team, will supply 24 hours service
e, our machine have good quality, 1 year guarantee and lifetime maintenance
Q:What should we prepare except material?
A:You should prepare workshop, water line, electric line, compress air. We can supply workshop layout drawing.
Q: Where is your factory located? How can I visit there?
A: our factory is located in Longkou city, Shandong province, you can fly to Yantai or Qingdao airport, yantai airport is nearer than Qingdao airport. When you confirm flight No. and time please tell me then we can pick up you.