Factory Price Good Quality Most cost-effective Prefbaricated modular house, movable houses Yaoda Quality Choice
USD $35 - $69 /Square Meter
Min.Order:100 Square Meters
Guangzhou Ruosky Building Material Co., Ltd.
The prefabricated house is an pre-engineered lightweight steel structure which is widely used for the large-scale workshop, or used for the office, supermarkets, entertainment centers and other buildings. And the lightweight steel structure prefabricated house is good at easy installation, stable structure, earthquake proofing, water proofing, energy conserving and environmental protection, etc
Advantages of Lightweight steel structure prefabricated house as below:
1. Easy to assemble and disassemble with simple and common tools
2. 100% fireproof performance with rockwool sandwich panel.
3. Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.
4. Good performance of heat-insulation and Good waterproof performance without extra facilities.
5. Various designs available, customized designs acceptable.
6. Low cost: unit price range from USD35 to USD69/square meter FOB according to customer’s request.
7. Lightweight Steel structure makes the house resist heavy wind of 140km/h and 8-grade earthquake
8. Widely used in construction site, office building, dormitory, disaster house, etc.
9. Safety and stable it could stand firmly more than 10 years.
The architecture type focus on single storey and multi-storey
Prefabricated house's detailed picture --Window
Prefabricated house's detailed picture--Column
Prefabricated house's detailed picture--Wall panel, window , door and column
Prefabricated house's detailed picture-- Roof Truss, wall
panel and column
Prefabricated house's detailed picture--Beam
Prefabricated house's detailed picture--Stairs
Prefabricated house's detailed picture--Purlin and Beam
Prefabricated house's detailed picture--Floor Plyood
Packing Details : Nude Packing,
Delivery Details : 20 days
This project was export to Qatar-Doha on Dec.11th 2014, and some detailed information for this project as below:
1. Building area: 2380㎡
2. Two floors and one floor
3. for Staff dormitory
4. K house with 6P and 3P Height
We sent the technicians to assistance installation for whole warehouse project and 28days to finished all.
This project was export to Indonesia-Surabya on Dec Augues.12th 2009, and some detailed information for this project as below:
1. Building area: 7890㎡
2. Two floors and one floor
3. for Staff dormitory and for office
4. K house with 6P and 3P Height
We sent the technicians to assistance installation for whole warehouse project and 30days to finished all.
This project was export to Indonesia-Surabya on July 15th 2010, and some detailed information for this project as below:
1. Building area: 9350㎡
2. Two floors and one floor
3. for Staff dormitory and for office
4. K house with 6P and 3P Height
We sent the technicians to assistance installation for whole warehouse project and 38days to finished all.