Interlocked HEM beam with groove machine
USD $15,000 - $30,000 /Set
Min.Order:1 Set
Cangzhou Zhongtuo International Trade Co., Ltd.
Interlocked HEM beam with groove machine
Brief introduction of Interlocked HEM beam with groove machine:
This interlocked Hem beam could be used to make various types Beam for supermakershelf or supporting system. And the interlocked seaming way is a method to make the raw material to tube type but it not seamless. The detail information of this machine will be shown below.
Interlocked HEM beam with groove machine quotation | |
Customer drawing profile | |
Pipe size | Square Pipe size:50x120mm |
Material |
|
Material thickness |
|
Input coil width |
|
Machine working process Decoiler—Feeding—Leveling—Roll Forming--Cutting--Product Table |
MACHIE BASIC PARAMETERS | ||
Name | Usage | Pictures |
Manual Expanded Decoiler | Support material: Manual expanded version. ID:350-500mm OD:1200MM Max loading:800kg Max width:300mm | |
Roll forming machine | 1.Roller station:24stations 3.Roller material: GCr12MoV 9.Voltage:380v,50Hz,3phase | |
Flying cutting saw | 1).Material: blade and mold material: Gr12 steel with quenched treated 60-62℃ .Cutting system: Advanced hydraulic drive, automatic cutting after forming, no distorting or wasting, high level safety factor. | |
PLC Control | 1.Screen: touch screen 2.PLC: Delta 3.Automatic-length measurement 4.Automatic-quantity measurement 5. Computer is used to control length and quantity. Machine will automatically cut to length and stop when required quantity is achieved Length inaccuracy can be amended easily | |
Hydraulic System | 1).Advanced hydraulic system from Taiwan 2). Power:3kw | |
Output frame | Could be welded locally according to customer needs. | |
Spare Parts | 1).Easy damaged parts: conk 2 pcs, fuse-link 4 pcs 2).Rubber mat 1 pcs; Bolt spanner 1 pcs. |
Payment terms | Terms of payment: 30% T/T down-payment, the balance 70% will be paid by T/T before shipment. |
Delivery time | 45daysafter receiving the down payment; |
Warranty | 1 year from the date of installation. |
After sales services: | 2. The Buyer charges the round-trip ticket for Engineer. The buyer is also responsible to bear expenses generated like meals, accommodation for engineers. 3. During guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by incorrect operations, we will provide the buyer spare parts at cost price. 4. We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide. |
Note: All the pictures are only for refer. All the equipment will be Designed according to customer’s requirements. Welcome to visit our company for further discussions. |