hydraulic corrugated iron making machine
USD $20,000 - $25,000 /Set
Min.Order:1 Set
Cangzhou Zhongtuo International Trade Co., Ltd.
1, Application of roof forming machine:
The panel forming line can manufacture various kinds of beautiful roof and wall panels. Produced panel has a beautiful appearance and bright color, which are widely used in garden, factory, resort, hotel, exhibition hall, vacationland, ancient architectures and modern villa.
2. Technical parameters
Configurations | Manual Uncoiler ,Guiding Platform ,Main Machine Of Roll Forming ,Electro-Motor,Cutting Device ,Hydraulic Station ,PLC Control, Supporter Table. |
Control System | PLC Colored Touch Screen |
Main Power | 5.5 kw |
Pump Power | 5.5 kw |
Power Supply | 380V, 3-Phase,50Hz or any |
Forming Speed | 10m/min |
Roll Station | 13 stands |
Shaft Diameter | 80mm |
Hydraulic Pressure | 10-12MPa |
Forming Size | 1050mm |
Feeding Thickness | 0.3-0.8mm |
Feeding Width | 1200-1220mm |
Cutter Standard | Cr12 |
Roller Standard | 45#steel with chrome coating heat treatment |
Cr-Plating Size | 0.05mm |
Overall Size | 8000×1650×1500mm |
Total Weight | 5.0T |
3.Package style:
Important Components Wiped Anti Rust Oil, Rollers and Shafters covered by foam film,
Hydraulic station, PLC control Box, Spare parts and some small parts packed in plywood box.
All Components Fixed by steel wire with Container.
4.Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5-7 days
Payment:
Port: XINGANG PORT TIANJIN CHINA Payment:30% T/T in advance, balance 70% after inspection confirmation before shipment. |
Delivery: within 45 working days after receipt of deposit.
Our service:
Warranty: One year, and we will provide the technical support for the whole life. Training: The buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary. Training time: one week (contains the time of installation and adjustment) |